Loading...
SC-Coppell MSN-LR 970911FUGRO- McCLELLAND (SOUTHWEST), INC. FIELD DENSITY REPORT � GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 CLIENT: Coppell ISD REPORT DATE September 11, 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO .: 0771 -2094 DATE PERFORMED: September 8, 1997 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark brown silty clay with organics (lime treated) 99.1 18.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 171 1 West parking area, 150 feet south, 100 98.3 21.6 99.2 feet west of southwest corner of building , final 172 1 West parking area, 100 feet south, 50 feet 98.0 21.0 98.9 west of southwest corner of building, final 173 1 West parking area, 250 feet south, 200 97.4 22.2 98.3 feet west of southwest corner of building, final 174 1 West parking area, 300 feet south, 250 94.8 20.7 95.7 feet west of southwest corner of building, final 175 1 West parking area, 220 feet south, 275 93.9 21.9 95.0 feet west of southwest corner of building, final 176 1 West fire lane, 100 feet south, 50 feet 97.3 19.6 98.2 west of southwest corner of building, final 177 1 West fire lane, 50 feet south, 50 feet west 97.3 20.2 98.2 of southwest corner of building, final Remarks: All densities meet project specifications unless otherwise noted. Burl Cooper Fugro- McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. - E. J. Williams (2) K A Sparks Contractors, Inc. - Jim Schooler City of Coppell - Garreth Campbell SHW Group - Joe Craddock SHW Group - Mike Elmore