Loading...
SC-Coppell MSN-LR 970910FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE: September 10, 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094 DATE PERFORMED: September 5, 1997 Contractors on Site: K. A. Sparks Contractors Inc. Remarks Pulverization /Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Location Percent Passing Percent Passing 1 3/4" Sieve #4 Sieve 1 West parking area approximately 300 100 62 feet north, 50 feet west of southwest corner of building 2 West parking area approximately 200 100 60 feet north, 150 feet west of southwest comer of building 3 West parking area approximately 150 100 61 feet north, 100 feet west of southwest comer of building 4 West parking area approximately 350 100 68 feet north, 250 feet west of southwest comer of building 5 West parking area approximately 400 100 70 feet north, 300 feet west of southwest corner of building 6 West Fire lane approximately 50 feet 100 65 north, 25 feet west of southwest corner of building 7 West Fire lane approximately 150 feet 100 63 north, 25 feet west of southwest corner of building 8 West Fire lane approximately 200 feet 100 69 north, 25 feet west of southwest corner of building Project Requirements: Minimum 100% Minimum 60% SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve Burl Cooper Fugro - McClelland Technician FUGRO McCLELLAND (SOUTHWEST), INC. Checked By SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore