Loading...
SC-Coppell MSN-LR 970909FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 9, 1997 PROJECT: Coppell Elementary School #10, Coppell, Texas Project No.: 0771 -2089 SAMPLE DATE: August 27, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks / Cortez 448981 CONCRETE SUPPLIER: Pioneer 92 PLANTITRUCK: 74 -381 87 MIX ID NUMBER: 9337 12:45 p.m. AIR ( %) ( ASTM C -231) : 1:30 p.m. WATER ADDED (gal): 15 Clear SLUMP (in.) (ASTM C -143) : 41/2 Slab on grade, area C -2, 5 feet South, 5 feet West of Northeast corner. CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CES 219 7 9/3/97 85000 3006 3000/28 days CES 220 28 9/24/97 CES 221 28 9/24/97 CES 222 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: _ f SMH /hb Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore �GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date September 9, 1997 PROJECT Coppell Elementary School #10, Coppell, Texas Project No.: 0771 -2089 SAMPLE DATE: August 27, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks/ Cortez 448947 CONCRETE SUPPLIER: Pioneer 80 PLANTITRUCK: 74 -567 84 MIX ID NUMBER: 9337 9:50 a.m. AIR ( %) (ASTM C -231) : LOAD 10:30 a.m. WATER ADDED (gal): 0 Clear SLUMP (in .) (ASTM C -143) : 5 Slab on grade, area C -2, 25 feet west, 5 feet north of southeast corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CES 211 7 9 -3 -97 78000 2758 3000/28 days CES 212 28 9 -24 -97 CES 213 28 9 -24 -97 CES 214 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C- 143, Types of Z 0 Curing: Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore