SC-Coppell MSN-LR 970716�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
FIELD DENSITY REPORT
CLIENT: Coppell ISD REPORT DATE: July 16, 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO .: 0771 -2094
DATE PERFORMED: July 10, 1997
MOISTUREIDENSITY RELATIONS
Material Proctor Results
Number Description Maximum Dry Density (pct) Optimum Moisture ( %)
1 Dark gray and brown silty clay with organics 107.6 17.7
2 Tan, yellow, brown and gray shaley clay mix 105.5 20.2
TEST RESULTS
TEST
PROCTOR
LOCATION
UNIT DRY
MOISTURE
PERCENT OF
NO.
NO.
WEIGHT
CONTENT PERCENT
MAXIMUM DENSITY
112
1
Perimeter Road, 300 feet south of Vista
104.3
17.9
96.9
Ridge Blvd, east road, 2nd lift
113
1
Perimeter Road, 450 feet south of Vista
103.7
18.4
96.4
Ridge Blvd, east road, 2nd lift
114
2
Future Road, 450 feet south of Vista
101.3
21.9
96.0
Ridge Road, 2nd lift
115
2
Future Road, 650 feet south of Vista
102.5
21.1
97.2
Ridge Road, 2nd lift
116
2
Future Road, 800 feet south of Vista
103.3
21.1
97.9
Ridge Road, 2nd lift
Remarks:
All densities
meet project specifications unless otherwise noted.
Jason Brimingham / Scott Rogers
Fug ro- McClelland Technician
SMH /mv
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc. - E. J. Williams (2)
K A Sparks Contractors, Inc. - Jim Schooler
FUGRO (SOUTHWEST), INC.
Checked b
City of Coppell - Garreth Campbell--- -
SHW Group - Joe Craddock
SHW Group - Mike Elmore