Loading...
SC-Coppell MSN-LR 970703�GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD REPORT DATE July 3, 1997 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO.: 0771 -2094 Page 1 DATE PERFORMED: June 27, 1997 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) optimum Moisture ( %) 1 Tan, yellow, brown and gray shaley clay mix 105.5 20.2 2 Dark gray and brown silty clay with organics 107.6 17.7 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 88 1 Storm drain, line C, station 1 +70, 1st lift 101.9 21.8 96.6 89 1 Storm drain, line C, station 1 +90, 2nd lift 104.0 18.9 98.6 90 2 Storm drain, line C, station 1 +95, final 106.4 19.9 98.9 91 2 Storm drain, line C, station 4 +55, 1 st lift 104.2 21.3 96.8 92 2 Storm drain, line C, station 4 +62, final 107.2 18.5 99.6 93 1 Storm drain, line c, station 6 +50, final 105.9 21.8 100.4 94 1 6 inch sanitary sewer, 100 feet south of 100.4 22.2 95.1 elementary school, 1st lift 95 1 6 inch sanitary sewer, 100 feet south of 100.9 21.6 95.6 elementary school, 2nd lift 96 1 6 inch sanitary sewer, 100 feet south of 1 00.2 21.9 95.0 elementary school, 3rd lift 97 1 6 inch sanitary sewer, 100 feet south of 100.6 22.6 95.4 elementary school, 4th lift 98 1 6 inch sanitary sewer, 100 feet south of 101.8 23.3 96.5 building, 5th lift 99 1 6 inch sanitary sewer, 30 feet south of 102.8 22.1 97.4 exiting building, 25 feet east of manhole, 1st lift 100 1 6 inch sanitary sewer, 30 feet south of 100.2 23.2 95.0 exiting building, 30 feet east of manhole, 2nd lift FUGRO- McCLELLAND (SOUTHWEST), INC. UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSITY 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD REPORT DATE: July 3, 1997 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO.: 0771 -2094 Page 2 DATE PERFORMED: June '27, 1997 TEST RESULTS TEST PROCTOR NO. NO. 101 1 LOCATION 6 inch sanitary sewer, 30 feet south of exiting building, 40 feet east of manhole, final 101.2 22.4 — Fu ' GRO 1 95.9 Remarks: All densities meet project specifications unless otherwise noted. Bob Shea Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler City of Coppell - Garreth Campbell SHW Group - Joe Craddock SHW Group - Mike Elmore