SC-Coppell MSN-LR 970421FUGRO-McCLELLAND (SOUTHWEST), INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
MOISTURE/DENSITY RELATIONSHIP OF SOILS
CLIENT: Coppell ISD, c/o K A Sparks Contractors, Inc. REPORT DATE April 21, 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094
SAMPLE DATE: April 9,.1997
METHOD OF TEST:
SAMPLE IDENTIFICATION:
Sample Description:
Sample Origin:
MOISTUREIDENSITY:
Preparation Procedure:
Rammer Description:
Maximum Dry Density: (lbs/cu ft)
Optimum Moisture Content ( %):
ATTERBERG LIMITS:
Liquid Limit:
Plastic Limit:
Plasticity Index:
GRAIN SIZE:
Percent Passing ( -200) Sieve:
Mark Strittmatter
Fugro - McClelland Technician
ASTM D -698A
Light brown sand and light gray silty clay with
organics
On -site
Moist
Mechanical
121.6
12.5
18
13
5
n/a
FUGRO McCLELLAND (SOUTHWEST), INC.
Checked by:
SMH /so
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell 1
K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler
SHW Group - Mike Elmore SHW Group - Joe Craddock
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
MOISTURE /DENSITY RELATIONSHIP OF SOILS
CLIENT: Coppell ISD, Go K A Sparks Contractors, Inc. REPORT DATE: April 21, 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
SAMPLE DATE: April 9,1997
METHOD OF TEST:
SAMPLE IDENTIFICATION:
Sample Description:
Sample Origin:
MOISTURE/DENSITY:
Preparation Procedure:
Rammer Description:
Maximum Dry Density: (lbs/cu ft)
Optimum Moisture Content ( %):
ATTERBERG LIMITS:
Liquid Limit:
Plastic Limit:
Plasticity Index:
GRAIN SIZE:
Percent Passing ( -200) Sieve:
Mark Strittmatter
Fugro - McClelland Technician
ASTM D -698A
Dark gray and brown silty clay with organics
On -site
Moist
Mechanical
107.6
17.7
41
17
24
n/a
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked by:
SMH /so
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler
SHW Group - Mike Elmore SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
MOISTURE /DENSITY RELATIONSHIP OF SOILS
CLIENT: Coppell ISD, c/o K A Sparks Contractors, Inc. REPORT DATE: April 21, 1997
PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
- SAMPLE: DATE: April 7, 1997
METHOD OF TEST:
SAMPLE IDENTIFICATION:
Sample Description:
Sample Origin:
MOISTURE/DENSITY:
Preparation Procedure:
Rammer Description:
Maximum Dry Density: (lbs/cu ft)
Optimum Moisture Content ( %):
ATTERBERG LIMITS:
Liquid Limit:
Plastic Limit:
Plasticity Index:
GRAIN SIZE:
Percent Passing ( -200) Sieve:
Jose Rivera
Fugro - McClelland Technician
ASTM D -698A
Dark brown silty clay with yellow clayballs
Off -site pile at southwest comer of Vista Ridge and
Rockbrook
49
20
29
n/a
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked by:
SMH /so
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler
SHW Group - Mike Elmore SHW Group - Joe Craddock
W
11 9
FUGRO- McCLELLAND (SOUTHWEST), INC. lal
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
MOISTURE /DENSITY RELATIONSHIP OF SOILS
CLIENT: Coppell ISD, c/o K A Sparks Contractors, Inc. REPORT DATE: April 21, 1997
PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
SAMPLE DATE: April '7, 1997
METHOD OF TEST:
SAMPLE IDENTIFICATION:
Sample Description:
Sample Origin:
MOISTURE/DENSITY:
Preparation Procedure:
Rammer Description:
Maximum Dry Density: (lbs/cu ft)
Optimum Moisture Content ( %):
ATTERBERG LIMITS:
Liquid Limit:
Plastic Limit:
Plasticity Index:
GRAIN SIZE:
Percent Passing ( -200) Sieve:
Jose Rivera
Fugro - McClelland Technician
ASTM D -698A
Yellowish brown silty clay
Off -site pile at southwest comer of Vista Ridge and
Rockbrook
55
23
32
n/a
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked by:
SMH /so
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler
SHW Group - Mike Elmore SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
MOISTURE/DENSITY RELATIONSHIP OF SOILS
CLIENT: Coppell ISO, c/o K A Sparks Contractors, Inc. REPORT DATE April 21, 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
SAMPLE DATE: April 7, 1997
METHOD OF TEST:
SAMPLE IDENTIFICATION:
Sample Description:
Sample Origin:
MOISTURE/DENSITY:
Preparation Procedure:
Rammer Description:
Maximum Dry Density: (lbs/cu ft)
Optimum Moisture Content ( %):
ATTERBERG LIMITS:
Liquid Limit:
Plastic Limit:
Plasticity Index:
GRAIN SIZE:
Percent Passing ( -200) Sieve:
Jose Rivera
Fugro - McClelland Technician
ASTM D -698A
Dark brown silty clay
Off -site northeast corner of Vista Ridge and
Rockbrook
Moist
Mechanical
111.7
16.3
37
16
21
n/a
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked by:
SMH /so
Distribution: Coppell ISO - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler
SHW Group - Mike Elmore SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC.
�GRO
■
G�
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
MOISTURE /DENSITY RELATIONSHIP OF SOILS
CLIENT: Coppell ISD, c/o K A Sparks Contractors, Inc. REPORT DATE: April 21, 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
SAMPLE DATE: April 7, 1997
METHOD OF TEST:
SAMPLE IDENTIFICATION:
Sample Description:
Sample Origin:
MOISTURE/DENSITY:
Preparation Procedure:
Rammer Description:
Maximum Dry Density: (lbs/cu ft)
Optimum Moisture Content ( %):
ATTERBERG LIMITS:
Liquid Limit:
Plastic Limit:
Plasticity Index:
GRAIN SIZE:
Percent Passing ( -200) Sieve:
Jose Rivera
Fugro - McClelland Technician
ASTM D -698A
Medium brown silty clay
Off -site Pile at northeast corner of Vista Ridge and
Rockbrook
moist
Mechanical
110.3
16.9
41
16
25
n/a
FUGRO- McCLELLAND (SOUTHWEST), INC.
a
Checked by: 1
SMH /so
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams K A Sparks Contractors, Inc. - Jim Schooler
SHW Group - Mike Elmore SHW Group - Joe Craddock