Loading...
Vista Point 2R-LR061229 REED! EnGinEERinG ____n ._..__._~___..__~_~ GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 75 REG PROJECT NO. 13581 SAMPLE DATE: 12-01-06 TECHNICIAN: C. Johnson PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Inlet Walls and Bottom: Line ST-3, STA 0+70 Desi n Information Source of Concrete LMC Mix Identification 1701 ecified Stren 4000 Date Tested 12-08-06 12-29-06 12-29-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 108420 158720 153650 5530 C linder Data Set Cylinder No. 10 1 9152 Air Entrainment 1.6 Ticket Number 7173703 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214J 350 5600 . c.u [214] 3500019