Vista Point 2R-LR061220
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Cappel!, Texas
REPORTED TO: Bullard Construction, Inc
PO. Box 575
Addison, Texas 75001
A TTN Mr Keith McMahon
l
CONTRACTOR: Bullard Construction, Inc.
REPORT NO. 72
REG PROJECT NO. 13581
SAMPLE DATE: 11-22-06
TECHNICIAN: J. Seeton
PAGE: 1 of 1
Location of Sample
Set Number Location
1 Pavin 60'S, 80'E from SE corner of Bid
Represented
Mix Identification
23601504
Specified Stren th p.s.i.
3600
Date Tested
11-29-06
12-20-06
12-20-06
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
103720
122240
127310
4420
C linder Data
Set Cylinder
No. ID
1 8978A
Time of
Sample
655AM
Air
Entrainment
3.4
Ticket
Number
13675494
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
jl,'iSi !/[)~. S
~()C. [)^li^S 1X/5735. I" [71~]3505600. ",'[71~]3500019