Loading...
Vista Point 2R-LR061220 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Cappel!, Texas REPORTED TO: Bullard Construction, Inc PO. Box 575 Addison, Texas 75001 A TTN Mr Keith McMahon l CONTRACTOR: Bullard Construction, Inc. REPORT NO. 72 REG PROJECT NO. 13581 SAMPLE DATE: 11-22-06 TECHNICIAN: J. Seeton PAGE: 1 of 1 Location of Sample Set Number Location 1 Pavin 60'S, 80'E from SE corner of Bid Represented Mix Identification 23601504 Specified Stren th p.s.i. 3600 Date Tested 11-29-06 12-20-06 12-20-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 103720 122240 127310 4420 C linder Data Set Cylinder No. ID 1 8978A Time of Sample 655AM Air Entrainment 3.4 Ticket Number 13675494 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc jl,'iSi !/[)~. S ~()C. [)^li^S 1X/5735. I" [71~]3505600. ",'[71~]3500019