Belt Line Trade-LR061225
REED EnGinEERinG
GEOTECHNICAL AND G R CJ U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Belt Line Trade Center Building A
500 E. Belt Line Road
Cappel!, Texas
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 160
REG PROJECT NO. 13335
SAMPLE DATE: 11-27-06
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 2
CONTRACTOR: Raymond Construction
Location of Sam
Set Number
1
2
3
Ie
Location
Paving: 30'S, 180'E from SW bldg. corner
Paving: 5'N, 35'W from SW bldg. corner
Pavin : 130'S, 680'E from SW bid . corner
Mix Identification
1551
ecified Stren
4000
Age@ Total Load
Date Tested Test Ibs.
12 -04-06 7 111250
12-25-06 28 140630
12-25-06 28 144300
Hold H
2 9016 12-04-06 7 65890 2330
9016 12-25-06 28 96700 "3420
9016 12-25-06 28 95660 "3390
9016 01-22-07 56
3 9017 12-04-06 7 93390 3300
9017 12-25-06 28 120860 4280
9017 12-25-06 28 124500 4410
9017 Hold H
"Does not meet project specification.
5050
"3410
4350
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214] 3505600 . FAX [214] 3500019
REPORT NO. 160
REG PROJECT NO. 13335
SAMPLE DATE: 11-27-06
PAGE: 2 of 2
"Does not meet project specification.
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Constructionl
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
Air
Entrainment
4.3
"1.5
4.3
Ticket
Number
7173573
1410342
7173593
REED ENGINEERING GROUP, L TO.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc