Loading...
Belt Line Trade-LR061225 REED EnGinEERinG GEOTECHNICAL AND G R CJ U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Belt Line Trade Center Building A 500 E. Belt Line Road Cappel!, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell REPORT NO. 160 REG PROJECT NO. 13335 SAMPLE DATE: 11-27-06 TECHNICIAN: G. Tsougarakis PAGE: 1 of 2 CONTRACTOR: Raymond Construction Location of Sam Set Number 1 2 3 Ie Location Paving: 30'S, 180'E from SW bldg. corner Paving: 5'N, 35'W from SW bldg. corner Pavin : 130'S, 680'E from SW bid . corner Mix Identification 1551 ecified Stren 4000 Age@ Total Load Date Tested Test Ibs. 12 -04-06 7 111250 12-25-06 28 140630 12-25-06 28 144300 Hold H 2 9016 12-04-06 7 65890 2330 9016 12-25-06 28 96700 "3420 9016 12-25-06 28 95660 "3390 9016 01-22-07 56 3 9017 12-04-06 7 93390 3300 9017 12-25-06 28 120860 4280 9017 12-25-06 28 124500 4410 9017 Hold H "Does not meet project specification. 5050 "3410 4350 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214] 3505600 . FAX [214] 3500019 REPORT NO. 160 REG PROJECT NO. 13335 SAMPLE DATE: 11-27-06 PAGE: 2 of 2 "Does not meet project specification. Mail Distribution: (1) IDI/Mr. Chris Parnell (1) Raymond Constructionl Mr. David Layne (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: Air Entrainment 4.3 "1.5 4.3 Ticket Number 7173573 1410342 7173593 REED ENGINEERING GROUP, L TO. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc