Stoneleigh P1-LR 980408A ALPHA TESTING, INC.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620 -8911
TESTED FOR: FIRST WORTHING COMPANY
DALLAS, TEXAS
PROJECT: STONELEIGH AT RIVERCHASE
COPPELL, TEXAS
REPORT OF CONCRETE
COMPRESSION TEST
DATE OF ISSUE:
OUR REPORT NO.:
APRIL 8, 1998
97060 -118
FIELD DATA
PAVING; 75' NORTH & 20' EAST OF NE CORNER OF
LOCATION OF CONCRETE PLACEMENT CLUB HOUSE
0 3 / 9 8
TYPE
CURING
DATE
TESTED
DATE PLACED
13 / 0
PLANT
12855
TIME
4
DELIVER TICKET NO
LAB
SLUMP (ASTM C -143)
5 *
AIR CONTENT C ❑ OR C � .
MIX PROPORTIONS (SSD)
CEMENT
N/A
(ASTM -231 -173
73
3,390
N/A
AIR TEMPERATURE
WATER
28
CONCRETE TEMPERATURE 70
FINE AGGREGATE
N/A
DATE RECEIVED 04/09/98
COARSE AGGREGATE
N/A
FIELD DATA SUBMITTED BY D. H.
ADMIXTURE
N/A
MIX DATA SUBMITTED BY RED I - M I X
136
LAB
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 U.eg C -1231 ❑
H
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12 ")
(ASTM C -39)
LAB
NO.
TYPE
CURING
DATE
TESTED
AGE
DAYS
TOTAL
LOAD
AREA
COMPRESSIVE
STRENGTH, PSI
133
LAB
04/15/98
7
95,914
28.27
3,390
134
LAB
05/06/98
28
106,726
28.27
3,780
135
LAB
05/06/98
28
111,585
28.27
3,950
136
LAB
HOLD
H
28.27
Specifications 28
3, 0 0 0
* CONTRACTOR INFORMED OF LOW AIR CONTENT
REMARKS
Minders made by ALPHA
representative.
❑ Cylinders made by Architect's
or Contractor's representative.
Er-Cylinders picked up by ALPHA
laboratory.
❑ Cylinders delivered to ALPHA
l aboratory.
L3' Compression test results comply with
applicable specifications.
❑ Compression test results do not comply
with applicable specifications.
El
Respectfully Submitted
TESTI
ER
ALPHA TESTING, INC.
2209 Wisconsin St.
I� AxllSuite 100
Dallas, Texas 75229
(214) 620 -8911
TESTED FOR: FIRST WORTHING COMPANY
DALLAS, TEXAS
PROJECT: STONELEIGH AT RIVERCHASE
COPPELL, TEXAS
REPORT OF CONCRETE
COMPRESSION TEST
DATE OF ISSUE:
OUR REPORT NO.:
APRIL 8, 1998
97060 -117
FIELD DATA
PAVING: 25' NORTH & 15' WEST OF NE CORNER OF
LOCATION OF CONCRETE PLACEMENT CLUB HOUSE
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12 ")
(ASTM C -39)
LAB
NO.
TYPE
CURING
DATE
TESTED
1
DATE PLACED
0 2 / 0 0
PLANT
129
TIME
4.5
DELIVER TICKET NO
N/A
SLUMP (ASTM C -143)
7 5 *
MIX PROPORTIONS (SSD)
N/A
AIR CONTENT (ASTM C -231 ❑ OR C -173
Er�
70
CEMENT
N/A
AIR TEMPERATURE
CONCRETE TEMPERATURE
70
WATER
FINE AGGREGATE
N/A
DATE RECEIVED
04/09/98
COARSE AGGREGATE
N/A
FIELD DATA SUBMITTED BY
D. H.
ADMIXTURE
N/A
MIX DATA SUBMITTED BY
REDI -MIX
Specifications 28
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C -617 Q,40 if C -1231 ❑
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12 ")
(ASTM C -39)
LAB
NO.
TYPE
CURING
DATE
TESTED
AGE
DAYS
TOTAL
LOAD
AREA
COMPRESSIVE
STRENGTH, PSI
129
LAB
04/15/98
7
91,098
28.27
3,240
130
LAB
05/06/98
28
122,421
28.27
4,330
131
LAB
05/06/98
28
117,39C
28.27
4,150
132
LAB
HOLD
H
28.27
Specifications 28
3, 000
* CONTRACTOR INFORMED OF LOW AIR CONTENT
REMARKS
8 Cylinders made by ALPHA
representative.
❑ Cylinders made by Architect's
or Contractor's representative.
❑ ylinders picked up by ALPHA
laboratory.
❑ Cylinders delivered to ALPHA
laboratory.
Impression test results comply with
applicable specifications,
❑ Compression test results do not comply
with applicable specifications.
Mctfuily Submitted
ALPHA TESTIN , N
ER
A ALPHA TESTING, INC.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620 -8911
TESTED FOR: FIRST WORTHING COMPANY
DALLAS, TEXAS
PROJECT: STONELEIGH AT RIVERCHASE
COPPELL, TEXAS
REPORT OF CONCRETE
COMPRESSION TEST
DATE OF ISSUE:
OUR REPORT NO.:
APRIL 8, 1998
97060 -116
FIELD DATA
PAVING: 50' NORTH & 20' WEST OF NE CORNER OF
LOCATION OF CONCRETE PLACEMENT BUI LD I14G 18
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12 ")
(ASTM C -39)
LAB
NO.
04/08/98
DATE PLACED
10 : 4 5
TIME
3.5
SLUMP (ASTM C -143)
N/A
AIR CONTENT (ASTM C -231 ❑ OR C
-173 - -,,Z • 7 5
AIR TEMPERATURE
70
CONCRETE TEMPERATURE
72
DATE RECEIVED
04/09/98
FIELD DATA SUBMITTED BY
D. H.
MIX DATA SUBMITTED BY
RED I – M I X
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C -617 ❑ OR C -1231 ❑
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12 ")
(ASTM C -39)
LAB
NO.
1
PLANT
12834
DELIVER TICKET NO
N/A
MIX PROPORTIONS (SSD)
N/A
CEMENT
N/A
WATER
FINE AGGREGATE
N/A
COARSE AGGREGATE
N/A
ADMIXTURE
N/A
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12 ")
(ASTM C -39)
LAB
NO.
TYPE
CURING
DATE
TESTED
AGE
DAYS
TOTAL
LOAD
AREA
COMPRESSIVE
STRENGTH, PSI
125
LAB
04/15/98
7
86,614
28.27
3,060
126
LAB
05/06/98
28
133,558
28.27
4,720
127
LAB
05/06/98
28
104,862
28.27
3,710
128
LAB
HOLD
H
28.27
Specifications 28
3, 000
* CONTRACTOR INFORMED OF LOW AIR CONTENT
REMARKS
C? made by ALPHA
representative.
❑ Cylinders made by Architect's
or Contractor's representative.
Minders picked up by ALPHA
laboratory.
❑ Cylinders delivered to ALPHA
laboratory.
Cwt ompression test results comply with
applicable specifications.
❑ Compression test results do not comply
with applicable specifications.
n
R� ctfully Submitted
/ ALPHA TEST IN
ER
IN 2209 Wisconsin St, Suite 100
! Dallas, Avas 75229
(972) 620 -8911
FIELD INSPECTION OF CONCRETE
Plwject Number a 7 D (o Date Of Placement y- 4" 4 S
Client Name - 4- w e I Date Cyls Recd In Lab
Pf ect Name 54owe I�e c, < < Concrete Supplier Q �� �M��x 2
Technician Name N 1� �N�o tit Spec(ficatiions: Slump l Air �(* 96 _
Set
#
Concrete
Supplier
Dcket #
Time
Truck
Disptch'd
Time
Cyl.L
Molded
Time
Truck
Unloaded
Yds.
Of
Conc.
Unit
w
(W)
I
Slump
to
R
I P
A it 916
94 3 4
q; 52
w 43
o
1 a
9,
2
2
12 94q
I l ob
Vl't00
11'.45
t
4"5
V.75
15. 16
0
L4. 5
I.
Not{fied of any item out of Spec{frcation: Time Item (s) k 1 -
Signature of Person NotVied.• X Z
Set
#
Air
Temp.
Con c.
Temp.
Req'd
Strength
(7Y4.
Molded
placement Location of Test Sample
-
70
3ooa
ALPHA TESTING, INC. Daily Field Report
2209 Wisconsin, Suite 100
Dallas, Texas 75229
TESTED FOR rio-s = = rF ..j Co m DATE
PROJECT NAME ALPHA RPT ali 0
WEATHER (Li TI l TEMP. RANGE 65 TO 70 TECHNICIAN h a o }k i r4 o
= = = = == - - - = == NN - - - N N - ==
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR
TYPE ONGOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
S.G. SUBGRADE FOR
WAS OBSERVED TO VERIFY THAT AREA(s) HAD BEEN PREPARED IN GENERAL ACCORDANCE
WITH [Geotechnical recommendations] [locally accepted standards].
MATERNAL. WHIILE ON SITE THE TECHNICIAN OBTAINED SOIL SAMPLE(S) FOR LABORATORY
PICK -UP ANALYSIS. THE SAMPLES) [was]. [were] OBTAINED FROM THE FOLLOWING
LOCATION(S):
F D T A TOTAL OF _ FIELD DENSITY TESTS [was] [were] PERFORMED ON [fliq [select fill] [natural sgj
[stabilized soils] [ImodiAed soils] [base materials] FOR
AREA(S).
[see attached repbd for results of fleld compaction testing] '
[site representative was informed that results would be available as soon as laboratory testing was
complete]
GRADATION WHILE ON SITE THE TECHNICIAN PERFORMED FIELD GRADATION(S) TEST(S) ON THE
[Lime stabilized] [cement modified] MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS
PRE -POUR THE TECHNICIAN OBSERVED THE PRE -POUR CONDITION OF
THE TECW41CUW OBSERVED THE AREA(s) FOR PROPER [vapor barrier] [Grade beam size] [steel reinforcing]
AND [post tension cable lay out]. ' [No deficiencies were noted during the observation]
[The-following exceptions were noted]:
CONCRETE THE TECHNICIAN MOLDED SET(S) OF est cylinder [flexural beams]
[cubes] [prisims] FROM rate [mortar] [grout] PLACED F
Q6 V t l ON THIS DATE.
LAB TEST LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A
SEPERATE REPORT.
WHO WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS.
CANCEL THE TECHNICIAN WAS INFORMED THAT NO TESTING WOULD BE REQUIRED FOR
AS
TYPE AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.