Stoneleigh P1-LR 980406ALPHA TESTING, INC. IFIX/ 2209 Wisconsin St. 1 Suite 100 Dallas, Texas 75229 (214) 620 -8911 TESTED FOR: FIRST WORTHING COMPANY DALLAS, TEXAS PROJECT: STONELEIGH AT RIVERCHASE COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: OUR REPORT NO.: FIELD DATA APRIL 6, 1998 97060 -114 & 45' EAST OF SE CORNER OF PAVING: 30' NORTH LOCATION OF CONCRETE PLACEMENT BUILDING 15 DELIVER TICKET NO 04/06/98 DATE PLACED TIME 0 8 : 0 0 SLUMP (ASTM C -143) 4.5 AIR CONTENT (ASTM C -231 ❑ OR C -173 ❑ )4. 5 AIR TEMPERATURE 56 CONCRETE TEMPERATURE 65 DATE RECEIVED 04/07/98 FIELD DATA SUBMITTED BY D.H. MIX DATASUBMIITED BY REDI -MIX SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C -617 ❑ OR C -1231 ❑ APRIL 6, 1998 97060 -114 & 45' EAST OF SE CORNER OF MIX PROPORTIONS (SSD) N/A CEMENT N/A WATER N/A FINE AGGREGATE N/A COARSE AGGREGATE N/A ADMIXTURE N/A COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12 ") (ASTM C -39) LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE NO. CURING TESTED DAYS LOAD STRENGTH, PSI 117 LAB 04/13/98 7 79,949 28.27 2,830 118 LAB 05/04/98 28 103,557 28.27 3,660 119 LAB 05/04/98 28 105,554 28.27 3,730 120 LAB HOLD H 28.27 Specifications 28 3, 000 REMARKS is Cylinders made by ALPHA representative. ❑ Cylinders made by Architect's or ontractor's representative. Cylinders picked up by ALPHA laboratory. ❑ Cylinders delivered to ALPHA la atory. Compression test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. 9AT7I y MS , INC. l STETTNER COMPUDATA- CGO1083 -34 5 PLANT 5 5 2 3 8 4 DELIVER TICKET NO COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12 ") (ASTM C -39) LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE NO. CURING TESTED DAYS LOAD STRENGTH, PSI 117 LAB 04/13/98 7 79,949 28.27 2,830 118 LAB 05/04/98 28 103,557 28.27 3,660 119 LAB 05/04/98 28 105,554 28.27 3,730 120 LAB HOLD H 28.27 Specifications 28 3, 000 REMARKS is Cylinders made by ALPHA representative. ❑ Cylinders made by Architect's or ontractor's representative. Cylinders picked up by ALPHA laboratory. ❑ Cylinders delivered to ALPHA la atory. Compression test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. 9AT7I y MS , INC. l STETTNER COMPUDATA- CGO1083 -34 REMARKS is Cylinders made by ALPHA representative. ❑ Cylinders made by Architect's or ontractor's representative. Cylinders picked up by ALPHA laboratory. ❑ Cylinders delivered to ALPHA la atory. Compression test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. 9AT7I y MS , INC. l STETTNER COMPUDATA- CGO1083 -34 ALPHA TESTING, INC. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (214) 620 -8911 TESTED FOR: FIRST WORTHING COMPANY DALLAS, TEXAS PROJECT: STONELEIGH AT RIVERCHASE COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: OUR REPORT NO.: APRIL 6, 1998 97060 -113 FIELD DATA & 20' EAST OF SE CORNER OF PAVING: 45' SOUTH LOCATION OF CONCRETE PLACEMENT BUILDING 15 DELIVER TICKET NO 04/06/98 DATE PLACED N/A TIME 08:00 SLUMP (ASTM C -143) 5 AIR CONTENT (ASTM C -231 ❑ OR C -173 ❑ ) 5 AIR TEMPERATURE 54 CONCRETE TEMPERATURE 63 DATE RECEIVED 04/07/98 FIELD DATA SUBMITTED BY D.H. MIX DATA SUBMITTED BY RED I - M I X SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C -617 ❑ OR C -1231 ❑ & 20' EAST OF SE CORNER OF COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12 ") (ASTM C -39) LAB NO. 5 PLANT 5 2 3 7 4 DELIVER TICKET NO N/A MIX PROPORTIONS (SSD) N/A CEMENT 04/13/98 WATER N/A FINE AGGREGATE N/A COARSE AGGREGATE N/A ADMIXTURE N/A COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12 ") (ASTM C -39) LAB NO. TYPE CURING DATE TESTED AGE DAYS TOTAL LOAD AREA COMPRESSIVE STRENGTH, PSI 113 LAB 04/13/98 7 82,559 28.27 2,920 114 LAB 05/04/98 28 105,687 28.27 3,740 115 LAB 05/04/98 28 103,569 28.27 3,660 116 LAB HOLD H 28.27 Specifications 28 1 3, 0 0 0 r:OMpUnATA -r.rn1 oR7 -.0 // REMARKS I� Cylinders made by ALPHA representative. ❑ Cylinders made by Architect's or Contractor's representative. Id'Cylinders picked up by ALPHA laboratory. ❑ Cylinders delivered to ALPHA l aboratory. 2 Compression test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. P C. AT STETTNER ALPHA TESTING, INC. Daily Field Report 2209 Wisconsin, Suite 100 Dallas, Texas 75228 TESTED FOR ts, o %A- w tT DATE 4- (- 4 S PROJECT NAME &1I ks I ALPHA RPT 9 G? 0 o. 0 WEATHER C 10 A P TEMP. RANGE _' Q TO 5X TECHNICIAN n a 0 )i 1 k d a THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR T ON-OOiN G WORK AND PERFORM FIELD TESTING AS REQUESTED. S.G. SUBGRADE FOR WAS OBSERVED TO VERIFY THAT AREA(s) HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH [Geobsahnical recommendations] [locally accepted standards]. MATEIIIIAL V"NX ON SITE 7W � SLR. 1�HE SOI SAMPLE(S) [was][w�ere] OBTAINED FROM FOLLOWING LOCATION(6): F D T A TOTAL OF _ FIELD DENSITY TESTS [was] [were] PERFORMED ON [flit] [select fill] [natural sg] [staWllad soil] [inoidlfled soils] [bass matsrlsls] FOR AREA(S). [sss attaolred iWort 16r rr suits of field compaction testing] [site reprssentotive was informed that results would be available as soon as laboratory testing was comPlate] GRADATION WHILE ON SITE THE TECHNICIAN PERFORMED FIELD GRADATION(S) TEST(S) ON THE [Lime stabilized] [cement modified] MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS PRE -POUR THE TECHNICIAN OBSERVED THE PRE -POUR CONDITION OF THE TECHNICIAN OBSERVED THE AREA(s) FOR PROPER [vapor bwrml [(Grade beam size] [steel reinforcing] AND [post tension cable layout]. • [No deficiencies were, during the observation] [The-following exceptions were noted]: E 1 91 AN e CONCRETE THE TECH MOLDED 3 _ SET(S) OF a Iinde [flexural beams] [cubes] [prisimsj F M rate [mortar] [gro t] PLACED FO y/]_4�S' S tttO�t 0- f Sf 1t ►� , f /.f ON THIS DATE. QP S 0;0V o-F Na'Ciew o-f /4 45 LAB TEST LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED A13OVE WILL FOLLOW ON A SEPERATE REPORT. WHO CANCEL TYPE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. THE TECHNICIAN WAS INFORMED THAT NO TESTING WOULD BE REQUIRED FOR AS AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. IIQ{!as, /IXQS /SiLY l 72 62t 1911 FIELD INSPECT ION OA' CONCRETE Project Number _q 10 la O Date Of Placement H - s ' 4 B aient Name F%kre+ we " Lll o Date Cyls. Recd In Lab Project Name 5 f9 N e I a is A} R I e � �1451� Concrete Supplier K� i -- fY1 hx Technician Name Dom A N-6 r+ Specifications.- Slump 5 Air 44 96 Set g Concrete up Tier Ticket p Time Truck Disptch'd Time Cyl& Molded Time Truck Unloaded Yds. Of Conc. Unit LTA OV) Slump R P Air 916 I 5 1 :374 5 : 3( T 1 1 I : 5-0 s' 3g G ; �� �; • � 7; y5 � o �, s � � .3 sz 4 7 to;oa. ;Sa 1b S Notified of any item out of Spec cation: Time Item (s) Signature of Person Notyied.• X Set g A it Temp. Conc. Temp. Req'd Strength C # Molded Placement Location of Test Sample L S 63 Sabo Arcn►eN'� - 3__ 5 6 5 1 Soon 3000 . .�a'N �',� o� —,SSE Gt N o B / dD • /5 Sb', X Ro'N o .. t eN N i APR 071' III ALPHA TESTING, INC. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (214) 620 -8911 TESTED FOR: FIRST WORTHING COMPANY DALLAS, TEXAS PROJECT STONELEIGH AT RIVERCHASE COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: OUR REPORT NO.: APRIL 6, 1998 97060 -115 FIELD DATA & 20' NORTH OF NE CORNER OF PAVING: 50' EAST LOCATION OF CONCRETE PLACEMENT BUILDING 15 DELIVER TICKET NO 04/06/98 DATE PLACED N/A TIME 10:15 SLUMP (ASTM C -143) 5 AIR CONTENT (ASTM C -231 ❑ OR C -173 ❑ ) 4 AIR TEMPERATURE 60 CONCRETE TEMPERATURE 62 DATE RECEIVED 04/07/98 FIELD DATA SUBMITTED BY D.H. MIX DATA SUBMITTED BY RED I — M I X SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C -617 ❑ OR C -1231 ❑ & 20' NORTH OF NE CORNER OF COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE S" X 12 ") (ASTM C -39) LAB NO. 5 PLANT 52394 DELIVER TICKET NO N/A MIX PROPORTIONS (SSD) N/A CEMENT 04/13/98 WATER N/A FINE AGGREGATE N/A COARSE AGGREGATE N/A ADMIXTURE N/A COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE S" X 12 ") (ASTM C -39) LAB NO. TYPE CURING DATE TESTED AGE DAYS TOTAL LOAD AREA COMPRESSIVE STRENGTH, PSI 121 LAB 04/13/98 7 71,238 28.27 2,520 122 LAB 05/04/98 28 108,997 28.27 3,860 123 LAB 05/04/98 28 103,578 28.27 3,660 124 LAB HOLD H 28.27 Specifications 28 3,000 cnupi InATA.rRn1 nna_u // REMARKS i� Cylinders made by ALPHA representative. ❑ Cylinders made by Architect's i r ntractor's representative. ylinders picked up by ALPHA laboratory. ❑ Cylinders delivered to ALPHA laboratory. L'J Compression test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. N es Iry S / HAT C. T STETTNER