Stoneleigh P1-LR 980326ALPHA TESTING, INC. 2200 Wisconsin St. Suite 100 Duels, Texas 75229 (214) 620 -8911 FIRST WORTHING COMPANY TESTED FOR: DALLAS, TEXAS PROJECT: STONELEIGH AT RIVERCHASE COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: OUR REPORT NO.: MARCH 26, 1998 97060 -101 FIELD DATA PAVING: 50' NORTH & 50' WEST OF NW CORNER OF LOCATION OF CONCRETE PLACEMENT BUILDING 18 03/26/98 TYPE CURING 1 DATE PLACED 09:45 PST 12111 TIME 5 DELIVER TICKET NO N/A SLUMP (ASITIA C-143) 5 C MIX PROPORTIONS (SSD) CEMENT N/A AIR CONTENT (ASTM C -231 ❑ OR -173 ❑ ) 70 2,690 N/A AIR TEMPERATURE 74 WATER N/A CONCRETE TEMPERATURE 03/27/98 FINE AGGREGATE N/A DATE ReCEfVED COARSE AGGREGATE 04/23/98 FIELD DATA8U9MITTED BY D. H. ADMIXTURE N/A MIX DATA SUBMITTED BY RED I - M I X 88 LAB SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 ❑ OR C -1231 ❑ H COMPRESSION TEST RESULTS (NOMINAL CYLLNDER SIZE 6" X 12') (ASTM C -39) LAB NO. TYPE CURING DATE TESTED AGE DAYS TO AL LOAD AREA COMPRESSIVE STRENGTH, PSI 85 LAB 04/02/98 7 76,012 28.27 2,690 86 LAB 04/23/98 28 141,900 28.27 5,020 87 LAB 04/23/98 28 133,257 28.27 4,710 88 LAB HOLD H 28.27 Specifications 28 3. non finders made by ALPHA representsWe. ❑ Cylinders made by Architects or Contractor's representative. Ilndere picked up by ALPHA laboratory. ❑ Cylinders deltvered to ALPHA l aboratory. 2 mpression test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. C#ETT ATSTly C. NER ALPHA TESTING, INC. 22091Msconsin St. /suite 100 Dakils, Texas 75229 (214) 620 -8911 FIRST WORTHING COMPANY TESTED FOR: DALLAS, TEXAS STONELEIGH AT RIVERCHASE PROJECT: COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: OUR REPORT NO.: MARCH 26, 1998 97060 -96 FIELD DATA PAVING: 25' WEST & 10' SOUTH OF NW CORNER OF LOCATION OF CONCRETE PLACEMENT BUILDING 18 03/26/98 TYPE CURING 1 DATE PLACED 06 :4 5 PLANT 12086 TIME 3 DELIVER TICKET NO N/A SLUMP O TM C -143) 4 MIX PROPORTIONS (SSD) N/A AIR CONTENT "TM C -231 ❑ OR C -173 ❑) 63 CEMENT N/A AIR TEMPERATURE 70 WATER N/A CONCRE1f TEMPERATURE 03/27/98 FINE AGGREGATE N/A DATE RECEIVED COARSE AGGREGATE 04/23/98 FIELD DATA SUBMITTED BY D • H • ADMIXTURE N/A MIX DATA SUBMITTED BY RED I - M I X 84 LAB SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 ❑ OR C -1231 ❑ H COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12') (ASTM C -39) LAB NO. TYPE CURING DATE TESTED AGE DAYS TOTAL LOAD AREA COMPRESSIVE STRENGTH, PSI 81 LAB 04/02/98 7 95,046 28.27 3,360 82 LAB 04/23/98 28 172,344 28.27 6,100 83 LAB 04/23/98 28 143,491 28.27 5,080 84 LAB HOLD H 28.27 Specifications 28 3, 000 REMARKS 9 made by ALPHA representative. ❑ Cylinders made by Architect's or Contractor's representative. 9-t i i nders picked up by ALPHA laboratory. ❑ Cylinders delivered to ALPHA laboratory. 24mpresslon test results comply with applicable specifications. ❑ Compression test results do not comply with applicable specifications. I led *I NC INC. 9AT ST 2209 Wisconsin SL, Suite 100 9 - ^0 'TION OF CONCRETE Daffas, Tew 75, FIELD INSPI 1// ix (972) 620,8911 FILE Project Number '17060 Date oirPlacement 3 -26- 9 Client Name LeL + w I A 'km 6 eopovi Date Cyls. Rec In La Project Name .S.6me te cA 44 2wer [ 1 1F Concrete Supplier M;x I Technician A% of chnician Mame 11. t j 1 6,kAJ Spec(Arati 5 ons. Slump A ir 96 Set # Concrete Supplier Ticket # Time Truck Disptch Time CYIS. Molded Time Truck Unloaded Ms. Of Conc. Unit w (W) Slump A ir 96 15 Notified of any item out of Spec#icadon: Time Item (s) Signature of Person Notitied. • X et A ir Conc. Reqd # # Temp. Temp. Strength �'Yls* ded Placement Location of Test Sample Mo6l 5,.o - '1v x 6,o'vi o4' tio eT k we-s47- C, It/ Mv T-RT31 MAR 2 6 10 ALPHA TESTING, INC. Daily Field Report 2208 Wisconsin, Suite 100 Dallas, Texas 75228 TESTED FOR = V. ' n " DATE .. PROJECT NAME Ar leinL ALPM RPT alt 9 47040' WEATHER TEMP. RANGE 6 6 TO 2 TECHNICIAN Da AI . A J � tJ THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR TY ON401NO WORK AND PERFORM FELD TESTWO AS REQUESTED. S.G. SUBGRADE FOR WAS OBSERVED TO VERIFY THAT AREA( *) HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH [Gsobdmical recommendations] (locally accepted standards). WHALE ON SITE THE TECHNICIAN Oi1TADW SOIL SAMPLE(S) FOR LABORATORY PLC • ANALYSIS. THE >ItAMPLE(S) [was] [were) OBTAINED FROM THE FOLLOWING LOCATM48): F D T A TOTAL OF — FIELD DENSITY TESTS [was] [were] PERFORMED ON [fill] [select fill] [natural 8M (stabilimd soft) Jim~ soils] [base materials] FOR AREA(S). [see attaWb :11sport for results of OWd compaction testing] . [sib representative was informed that results would be available as soon as laboratory testing was complete GRAMT*N WHILE ON SITE THE TECHNICIAN PERFORMED FIELD GRADATION(S) TEST(S) ON THE [Lime stabilized] [cement modified] MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS PRE -POUR THE TECHNICIAN OBSERVED THE PRE -POUR CONDITION OF THE TECHMlCIAN OBSERVED THE AREA(s) FOR PROPER IvaW bwnwl [Grade beam size] [steel reinforcing] AND [post tension cable lay out]. * [No deficiencies were noted during the observation] [The-following exceptions were noted): co R THE TECHNICIAN MOLDED 1 SET(S) OF test cyll d [flexural beams] [cubes] [prisims) FROM [concrete] [mortar] [grout] PLACED F 3^ Z G'�a SO'AJ X So'w a4 Na tik. iwl t�&4 /1 P n1 e.a: R 1.1a . IA —emu me- ON THIS DATE. LAB TEST LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPERATE REPORT. WHO WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. CANCEL THE TECHNICIAN WAS INFORMED THAT NO TESTING WOULD BE REQUIRED FOR AS TYPE AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RET40100 E. j 2 BN ••• `... Owa 01 3 - 2!0 - r18 FIL Dl* C)& M W bk Lab Steller +� ,• � i t`n � r� M ,' Slinep s Air A�q�ct MwW er cl 7 0 60 G Ivan" F►r J Wort �� 4 �oM�1 Rol — Mame 540Ne `P V\ R� F �UP C _ ician Aflamo e --, V� t N6 Set onc T # ? inie �'d ,TlOw Time L4� hw&d MS. � P �J�'') Air 916 � ao MMOed of any item out of Sp��w: lbw he Fn ( Signature of Person Not#ie+d• x Set Air C Req'd Cam. Placement Location of Test Sample # Temp. Temp. Struegdlt olded - O- r!JD?6 A- L - 1 b3_ '7o y r � ALPHA TESTING, INC. Daily Field Report 2208 Wisconsin, Suite 100 Dallas, Texas 75228 ------------ - - - - -- TESTED FOR r C m m, t2ANt - - - - - -- DATE - - - - -9 ------ - - - - -- 8 PROJECT NAME N k v i 5 IE ALPHA RPT # q7 0 O WEATHER 2kOkkr C \n s4 T MP. RANGE TO TECHNICIAN Q . H I oN THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR TYPE) ON -GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. S.G. SUBGRADE FOR WAS OBSERVED TO VERIFY THAT AREA(s) HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH [Geotechnicai recommendations] [locally accepted standards]. MATERIAL WHIILE ON SITE THE TECHNICIAN OBTAINED SOIL SAMPLE(S) FOR LABORATORY PICK -UP . ANALYSIS. THE SAMPLES) [was] [were] OBTAINED FROM THE FOLLOWING LOCATION(S): F D T A TOTAL OF FIELD DENSITY TESTS [was] [were] PERFORMED ON [fill] [select fill] [natural sg] [stabilized soils] [modified soils] [base materials] FOR AREA(S). [see attached report for results of field compaction testing] ' [site representative was informed that results would be available as soon as laboratory testing was complete] GRADATION WHILE ON SITE THE TECHNICIAN PERFORMED FIELD GRADATION(S) TEST(S) ON THE [Lime stabilized] [cement modified] MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS PRE -POUR THE TECHNICIAN OBSERVED THE PRE -POUR CONDITION OF THE TECHNICIAN OBSERVED THE AREA(s) FOR PROPER [vapor barrier] [Grade beam size] [steel reinforcing] AND [post tension cable lay out]. ' [No deficiencies were noted during the observation] [The following exceptions were noted]: CONCRET THE TECHNICIAN MOLDED ti SET(S) OF st cylinders ? exural ams] [cubes] [prisims] FROM J c ` oncrete] [mortar] [grout] PLACED FOR a5 u ] X 10 S L*4 Nf.'r - t n ,e r N)"' rn r Q\ 4C. I ii, ON THIS DATE. LAB TEST LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPERATE REPORT. WHO WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. CANCEL THE TECHNICIAN WAS INFORMED THAT NO AS TESTING WOULD BE REQUIRED FOR TYPE AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED �v ti - - :� V - ' � — = j � , ' DALLjr F ICE. X1998 Lj