DR8902-CS 891018 GINN, INC. CONSULTING ENGINEERS
Mr. Rick Bennett i o, 1989
SYB Construction Co. Inc. 'J
P.O. Box 13614 1~.~
Arlington, TX 76094-0614
Re: Bethel/Pelican Drainage Improvements
Dear Mr. Bennett:
We acknowledge your letter of October 12, 1989 requesting a final
inspection on this project. As we discussed on the phone today,
we will have the final walk through inspection this Friday,
October 20, 1989, at approximately 9:00 AM, on site.
City representatives will be Mr. Per Birdsall and Mr. Larry
Davis. Additionally, representatives from Ginn, Inc. will be
available.
Sincerely,
Gabe Favre
cc: Alan Ratliff
Russell Doyle, P.E.
Steve Goram
Howard Pafford
Richard Diano
Per Birdsall
Frank Trando
H. Wayne Ginn, Inc.
Randy Fleming
File 89420
17103 Preston Road · Suite 100 · LB 118 · Dallas, Tcxas 75248 · Phone 214/248-4900