Loading...
ST9401-CS 990218FEB 18 '99 06 :13AM WIER & ASSOCIATES P•3 WA MEMORANDUM TO: Garreth Campbell PROM: Ulys Lane DATE: 2 -18 -99 PROJECT: Denton Tap Road; Coppell, Texas W&A #: 94093 We made additional measurements of the installed aerial pipe system and contacted EBAA Iron to confirm whether sufficient clearances would be available for the Megalug joint restraint harness. The memo regarding this inquiry is attached. The clearance outside the pipe is a minimum 2.5 ". We measured approximately 3" of clearance. The clearance from the bell to install the restraint longitudinally along the pipe is a minim 5" of straight pipe. We did not measure the straight pipe but found 9" from the end of bell to the outside face of the hanger at the location where the hanger was closest to the joint. If the sloped part of the joint is 4" or less the MegaLug restraint can be installed. EBAA Iron suggested one restraint be ordered and attempted to be installed at the tightest location. The most northerly joints are closest to the hanger straps. The spacing increases with each joint from north to south and there is plenty of clearance except the two most northerly joints. I met with our structural engineer to evaluate where to allow the pipe joints to move longitudinally and how to restrain joints not secured by MegaLug restraints. We evaluated many options and determined to keep three joints non - restrained including the most outside joints and one in the center. We determined that a metal frame could be fabricated and secured from the top deck of the bridge. The frame will be designed to require two drilled (large) bolts through the deck and be bolted to the bottom of the deck. We looked at other methods to secure the pipe and feel this is a cost - effective method, which will not place any loads or longitudinal movement restraints on the pipeline. The frame will be slightly larger than the O. D. of the pipe and will not allow the pipe to deflect more than about 0.25" laterally. The structural Engineer has worked with a local fabrication shop locally and feels the metal frame restraint can be fabricated within three working days. Attached is a sketch indicating the location of the metal frame restraints and the MegaLug Restraints. The most difficult joint to be restrained with the MegaLug device is the north end. We suggest the sequence and plan of action to be as follows: 1. Martin Ledford will complete a structural design of the restraining frame today. 2. He can then contact the fabricator and start assembly of the metal frames. 3. We suggest one MegaLug Series 1100HD restraint harness be ordered immediately. 4. We will complete a plan drawing which details the installation. 4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700 FEB 18 '99 06 :14AM WIER & ASSOCIATES P•3 i- Memorandum February 18, 1999 W&A # Page 2 of 2 5. If the North Joint cannot be restrained by the MegaLug device, one additional metal restraint will be manufactured. 6. If the MegaLug restraint proves to work, six additional units would be ordered to restrain the remaining joints for a total of seven joints with MegaLug restraints. The MegaLugs can be order from several local supply houses but will be required to be shipped from the manufacturer. We have been coordinating with Brad Greer of Jim Cox Sales, Inc. He suggested that the contractor call him and he would provide ordering instructions and confirm which suppliers locally can order the material. He can be reached at 214 -353 -9070. Unless directed otherwise, we will begin design of the plan layout and the metal frame detail today. EBBA Iron is aware of the situation and told use they would assemble the Series 1100HD restraints in two days. Please call me if you have any questions or comments. S;.. M END OF MEMO Copy to: Robert Bibby Martin Ledford 4300 Beltway Place, Suite 130 Arlington, Texas 76018 metro (817) 467 -7700 FEB 18 '99 86 :16AM WIER a ASSOCIATES vM MEMORANDUM TO: Brad Greer FROM: Ulys Lane DATE: 2 -17 -99 PROJECT: Denton Tap Road Bridge; Coppell, Texas W&A #: 94093 The thighest clearances around the push joint 16" pipe is as shown on the attached details. Will the MegaLugg system clear? END OF MEMO P.6 4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700 I i 1 1� .�� . m a P.7 L ftCl;8 '99 06 I E � o s n � as N %v I i 1 1� .�� . m a P.7 SSOCIATES COMO: % _3 • • ow P. FEB 18 '99 06:17AM WIER & �30' DIA. PER SSOCIATES COMO: % _3 • • ow P. /16 /FEB 18 '99 OOHD SUE I'NUMMIt P.9 i , ,> : MEGALUG RESTRAINT HARNESS FOR DUCTILE IRON PUSH ON :r JOINTS ME- N SERIES 1199 4 a I0 r SAMPLE SPECIFICATION The restraint R "int For ductile iron pipe belt shall consist of the following - mmhanism shall consist of a plurality of individually activated gripping surfaces to maximize restraint capability. The rings and gripping surfaces shall be cast of duetile iron conforming to ASTM A536, Th Iarestraint harness shall be Series 1 I00HD as produced by EBAA iron, Inc. or app equal. 16 1104HD l 106HD I I08HD 1110H1? 11 12HD 1114HD 11 16H 1118HD 11 20H l 124HD 1130HD 1136M 11 42H L 148HD 06 :17AM & ASSOCIATES p OX. PRESSURE NO. OF BUL a SHIPPING RATING" 8 Dl�ER WT. 200 BOLTS ) 20 lbs. 350 2 % 38 lbs. 250 4 %4 43 lbs. 2$0 4 % 90 lbs. 250 4 1 102 lbs. 2$0 4 11 /' 1271 lbs. 175 6 '�• 144 lbs. 300 163 lbs. 300 8 % 176 lbs. 200 8 % 204 lbs. 200 10 '/• 311 lbs. 200 12 % 49216x. 200 16 1 546 tbs. 200 20 1 964 lbs. 175 24 11 /' 1271 lbs. 175 28 1 y 'Tested with a minimum 2:1 safety faetor. LENGTH (N) 12 12 8 l8 i8 is Is 18 18 is _ 8 24 24 MATER JU restraint ring and the bell ring are made of 60 -42 -10 ductile iron conforming .?' i',AS.TM A536. The tie bolts made from alloy steel- ,.: TECHNICAL INFO: 1.800- 633 -9190 FAX-- (8 17) 629 -2910 _ ALL OTHER INFO: 1400- 433 -1716 ":- 01=97 FAX: (817) 629-8931 a EISAA IRON P O. BOX 8187 INSTALLATION INSTRUCTIONS 1 Install spigot end of pipe into the bell in the normal manner. 2 Disassemble one split Megalug restraint and place boat halves on the spigot side of the joint. The lip of the restraint should always face toward the bell- Reassemble the clamps and plates to hold the two halves together tightening the bolts at the split$ to 60 ft-lbs. 3 Disassemble the second Megalug restraint (a split ring on the 6" and 8" sins) and place the halves around the pipe behind and as close to the bell as possible. Make sure the lip of the restraint faces the bell. Reassemble the clamps and plates to hold the two halves together, tightening the bolts at the splits to 60 ft -lbs. Align the split of the first restraint with the split of the second. 4 insert the tie bolts that c onnect the restraints. There should be a bolt at each available bolt hole for maximum distribution of the operating forces. Place nuts on tech end of each tic bolt. 3 Tighten the torque limiting twist off nuts in a clockwise direction (direction indicated by arrow on top of nut) until all we gels A in farm contact with the pipe Continue tightening in an alternate manner until all of the nuts have been twisted off. 6 Tighten the nuts on the tie bolts until they are snug against the restraint rings. w� EASTLAND, TEXAS 76AAS PHONE, 817/629.1 737