Loading...
ST9401-SP 990217�� P.O. BOX 478 The City WtA A BMUtif111 flRve 255 PARKWAY BLVD. COPPELL, TX 75019 FAX NO. (972) 304 -3570 ENGINEERING DEPARTMENT TO: F2 6U FIRM: FAX NO.: 0 ?7Z- 4 4 4'' i Z FROM: ��rc'e{ 1 PHONE NO.: o )y3a4''%fDS DATE: — I7 -- I I TRANSMITTED BY: TIME: NUMBER OF PAGES (INCLUDING COVERSHEET): '/ &n'k ( &rep' ca __J - m Qv� 'SA � S wc 0L�j6�7%VU IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304 -3679. Engineering - Excellence By Design s� FEB 16 '99 06 :59PM WIER & ASSOCIATES P.2 WA MEMORANDUM TO: Garreth Cambell FROM: Ulys Lane DATE: 2 -16 -99 PROJECT: Denton Tap Road; Coppell, Texas W&A #: 94093 Welding joints is not recommended for ductile iron pipe since the heating and cooling process with the high Carbon metal will make the pipe brittle. Attached is a copy of a EBAA Iron product which will secure the slip joints. It appears that the joint separation from differential contraction of the bridge versus the pipe is not an issue. It appears to me that the best solution at this point may be to place two or three lateral metal restraints at the existing openings for the diaphragms and connect directly to the pipe, At the joint closest to the lateral restraints the pipe joints can be left as slip joints. At the remaining joints Series 110OHD Split Megalug Restraints can be used to secure the joints and transfer any lateral loading to the restrained locations. I will discuss this with Martin Ledford and in the interim we will confirm the availability of the Megalug product. END OF MEMO Copy to: Martin Ledford 4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700 02 / i FEB„ 16 ' 99, _ 07 c 00PM , W I ER_ &, ASSOCIATES f.. P.31E 02 SERIES 1100 D MEGALUG* RESTRAINT HARNESS FOR DUCTILE IRON PUSH ON JOINTS C 01 /�/Wq "T a" N�RS Q� �5 3 90 7'0 � / 1 0 SPLIT uEGALuC ►uRNESS SERIES 1100MCJ INAL SERIES APPROX, PRESSURE NO.OF BOLT BOLT SIZE NUMBER SHIPPING RATING* TIE DIAMETER LENGTH WT. BOLTS (IN) (1M *. 1104HD 20 tbs. 350 2 '!. 12 ... 1106HD 38 tbs. 250 4 '/. 12 II08 43 lbs. 250 4 % 12 10 11 WHO 90 tbs. 250 4 12 11 12H 102 tbs. 250 4 '/• i8 14 11 14H 144 tbs. 300 6 '/. 18 16 11 16H — 163 tbs. 300 8 % 18 is 1118HD 176 tbs. 200 8 % 18 20 1120HD 204 tbs. 200 10 % I8 24 112411D 311 tbs. 200 12 % 18 30 1130HD 492 tbs 200 16 1 18 36 1136HD 546 tbs. 200 20 1 is 41142ND 964 tbs. 175 24 1'/• 2r4 1148HD 12711bs. 175 28 1'l. 24 "Tasted with a minisvuM 2'1 setery taccor. 1 2 3 4 SAMPLE SPECIFICATION for ductile iron pipe bell shall consist of the following. The restraint kin shall consist of a plurality of individually activated gripping surfaces line restraint capability. The rings and gripping surfaces shall be cast of S ,= conforming to ASTM A536, The restraint harness shall be Series as produced by EBAA iron, Inc. or approved equal. MATERIAL Z` J*e restraint ring and the bell ring are made of 60 -42 -10 ductile iron conforming to ASTM A536. The tie bolts made from low alloy steel. 6 TECHNICAL INFO; 1. 800 - 63"190 FAX: (817) 629 -2910 ALL OTHER INFO: 1.800.433 -1716 01122/97 FAX: (817) 629 -6931 JIM COX SALES INC INSTALLATION INSTRUCTIONS install spigot end of pipe into the bell in the nomol rMwer_ Disassemble one split Megalug restraint and place both halves on the spigot side of the joint. The lip of the restraint should always face toward the bell. Reassemble the clamps and plates to hold the two halves together tightening the bolts at the Splits to 60 ft -ibs. Disassemble the second Megalug restraint (a split ring on the 6" and 8" sizes) and place the halves around the pipe behind and as close to the bell as possible. Make sure the lip of the restraint faces the bell. Reassemble the clamps and plates to hold the two halves together, tightening the bolts at the splits to 60 R -lbs. Align the split of the first restraint with the split of the second. lasert the tie bolts That connect the restraints. There should be a bolt at each available bolt hole for maximum distribution of the operating forces. Place nuts on each end of each tie bolt. Tighten the torque limiting twist Off nuts in a clockwise direction (direction indicated by arrow on top of nut) until all wedges are in firm contact with the pipe surface. Continue tightening in an alternate manner until all of the nuts have been twisted off. Tighten the nuts on the tie bolts until they are snug against the restraint rings. E13AA WON P.O. BOX 987 EASTLAND, TEXAS 76448 PHONE; 817/629.1 737 a•Aw ai ii r w P.O. BOX 478 255 PARKWAY BLVD. COPPELL, TX 75019 FAX NO. (972) 304 -3570 ENGINEERING DEPARTMENT TO: S FROM: a1wlD6 ( I FIRM: iJ t:e 1 4,14 55oC PHONE NO.: FAX NO.: A(j'" 4 X1 1 1 J DATE: Z I I - 6 )9 1 TRANSMITTED BY: TIME: NUMBER OF PAGES (INCLUDING COVERSHEET): 1 w D _ IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304 -3679. Engineering - Excellence By Design r—�e — J T 6 I� r �7 1p I C� 1 " f� I N LA I' o S� r 1 " 7 0 r—�e — J T 6