Loading...
ST9401-CS 990127REB ON, INC. January 27, 1999 Mr. Jack Smith Pav Construction Co., Inc. P . Box 1087 edar Hill, Texas 75106 Re: Denton Tap Road City of Coppell Dear Jack: In a meeting yesterday with Mr. Garreth Campbell of the City of Coppell, we were instructed to install a 6 cm paving stone on the bridge median. The 6 cm paving stone will be used only on the bridge median. The remainder of the project will still use the 8 cm paving stone as originally designed. Please call me if you have any questions regarding this matter. Sincerely, REBCON, INC. Robert C. Bibby cc: Mr. Garreth Campbell City of Coppell 1 868 W. NORTHWEST HWY. DALLAS, TEXAS 75220 972/444 -6230