Loading...
DR8902-CS 891015SYB CONSTRUCTION CO., INC. ('ef'lified WBE - Dallas/Fort Worth P.O. Box 1361,1 Arlington, TX 76094-0614 Metro (817) 2614)226 October 15, 1989 Mr. Gabe Favre Ginn, Inc. Consulting Engineers 17103 Preston Rd. Suite 1lO-LB 118 Dallas, Texas 75248 RE: Bethel Pelican Drainage Improvements Dear Mr. Farve, In reguard to your request, the cost breakdown for change order # 2 is as follows: Concrete $ 2,772.00 Rebar 330.00 Saw Concrete & Seal 800.00 Forms 150.00 Equip. Rental 1,400.00 Labor & Overhead 3,000.00 TOTAL COST $ 8,422.00 TOTAL BID $ 9,500.00 TOTAL COST 8,4Z2.00 PROFIT $ 1,078.00 If you have any questions concerning this breakdown, please do not hesitate to give us a call. Sincerely, Rick Bennett Vice-President