DR8902-CS 891015SYB CONSTRUCTION CO., INC.
('ef'lified WBE - Dallas/Fort Worth P.O. Box 1361,1
Arlington, TX 76094-0614
Metro (817) 2614)226
October 15, 1989
Mr. Gabe Favre
Ginn, Inc.
Consulting Engineers
17103 Preston Rd.
Suite 1lO-LB 118
Dallas, Texas 75248
RE: Bethel Pelican Drainage Improvements
Dear Mr. Farve,
In reguard to your request, the cost breakdown for change order # 2 is as
follows:
Concrete $ 2,772.00
Rebar 330.00
Saw Concrete & Seal 800.00
Forms 150.00
Equip. Rental 1,400.00
Labor & Overhead 3,000.00
TOTAL COST $ 8,422.00
TOTAL BID $ 9,500.00
TOTAL COST 8,4Z2.00
PROFIT $ 1,078.00
If you have any questions concerning this breakdown, please do not hesitate
to give us a call.
Sincerely,
Rick Bennett
Vice-President