Loading...
ST9401-CN 981125A ^. 817 467 ? ?13 NOV 25 '98 09:14AM WIER & ASSOCIATES P.1i4 y WIER & ASSOCIATES, INC. V ENGINEERING SURVEYING LAND PLANNING V--e— 4300 BELTWAY PLACE, SUITE 1 30 ARLINGTON, TX 760 - 1097 METRO (81 7)467 -77110 METRO FAX (81 7) 467-771 3 ��z 4 $•..: r t Please deliver to the attention of Name Company Area Code/Number Martin Ledford 972 -304 -3570 Robert Bibby Rebcon Garreth Campbell City of Coppell FROM: Ulvs Lane DATE: November 25, 1998 TOTAL # OF PAGES 4 W&A # 94093 [WLUDNIG THIS COVER SHEET] ❑ ORIGINAL WILL FOLLOW VIA: ® ORIGINAL WILL NOT FOLLOW ❑ Regular Mail ❑ Hand Delivery ❑ Overnight ADDITIONAL MESSAGE: IF THIS TRANSMISSION IS INCOMPLETE OR UNREADABLE PLEASE CALL METRO 8171467 -7700 AS SOON AS POSSIBLE L NOV 25 '98 09 :11AM WIER & ASSOCIATES P.2 MEMORANDUM t; TO: Martin Ledford FROM: Ulys Lane DATE: 11 -25 -98 PROJECT: Denton Tap Road; Coppell, Texas W&A #: 94093 Martin we need the size and spacing of the bottom mat of steel. Also is the top mat horizontal steel #5 bars at five inch spacing. Please review this detail and provide comments A.S.A.P. The contractor is trying to tie steel and pour the west bridge over the deck early next week. We need to confirm these details. END OF MEMO 4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700 NOV 25 '98 09 :11RM WIER & ASSOCIATES IL a - ...::. i MEMORANDUM P.3 TO: Robert Bibby FROM: Ulys Lane DATE: 11 -25 -98 PROJECT: Denton Tap Bridge; Coppell, Texas W &A #: 94093 We prepared the attached CAD drawing showing the connected bridge median details. We have not confirmed the bottom mat reinforcing steel size and spacing from Martin Ledford who is out of town during the Thanksgiving Holiday. We will confirm the bottom mat reinforcing steel and provide a final detail early next week. END OF MEMO Copy to: Martin Ledford Garreth Campbell 4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700 =T i 35-i0' F/F r - 1 1 � 1 t 1 t I i t TEMP. GUARD RAIL. S SEE NOTE I / l 1 t f t 6' CURB r I Ieac 41 - 7' 4 '-7' <t 35' -10' F/F 1' -0' 1/2' t +0.82 • PAVESTONE LEVEL UP r 3. 115 O 10' C/C SAND OR GROUT 0.02 0 .02% 1 1 �-- CONST. JOINT i I tk5 BAR O 5' C/C x 4' - 4' ., BOTH MATS CENTER AT JOINT i { BOTTOM 6TEFL MAT I 3' -1 1/2' I 10' -O' WEST BR 1 D(E BEAMS 8 WEST OR DBE GELD ALIGNMENT TO CURRE CENTER MEDIAN DETAIL NT i DENTON CREEK BRIDGE SCALE 1/2' =1 -6' CURB PRECAST DECK ---� + DENOTES VERTICAL RELATIONSHIP TO CONTROL SET ALONG OUTSIDE CURB LINE OF BRIDGE. NOTE f I. CONTRACTOR SHALL PROVIDE TEMPORARY GUARD RAIL SYSTEM TO PROTECT TRAFFIC ALONG EAST SIDE OF NEST BRIDGE DURING CONSTRUCTION I MOVE EAST BRIDGE gJ BEAMS @ 2.33' TO WEST Z O N tD 00 0 U] F-+ 3 t H m Z] m A