DR8902-CS 890929 GINN, INC. CONSULTING ENGINEERS
September 29, 1989
Mr. Frank Trando
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re: Bethel School Road/Pelican Lane Drainage Improvements
Dear Mr. Trando:
Enclosed are three (3) copies of Application for Payment No. 3 in
the amount of $12,419.55 from S.Y.B. Construction Co., Arlington,
Texas, representing work completed for the above referenced
project through September 30, 1989.
We have reviewed this application and recommend that payment in
full be made at this time. Should you have any questions, please
do not hesitate to contact us.
Sincerely,
Wayne Ginn, P.E.
HWG/GF/dsp
cc: .... ~/~l~'Doyl~, P.E.
Steve Goram
S.Y.B. Construction
Randy Fleming w/enclosure
Gabe Favre w/enclosure
File 89420 w/enclosure
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900