Loading...
DR8902-CS 890929 GINN, INC. CONSULTING ENGINEERS September 29, 1989 Mr. Frank Trando City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Bethel School Road/Pelican Lane Drainage Improvements Dear Mr. Trando: Enclosed are three (3) copies of Application for Payment No. 3 in the amount of $12,419.55 from S.Y.B. Construction Co., Arlington, Texas, representing work completed for the above referenced project through September 30, 1989. We have reviewed this application and recommend that payment in full be made at this time. Should you have any questions, please do not hesitate to contact us. Sincerely,  Wayne Ginn, P.E. HWG/GF/dsp cc: .... ~/~l~'Doyl~, P.E. Steve Goram S.Y.B. Construction Randy Fleming w/enclosure Gabe Favre w/enclosure File 89420 w/enclosure 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900