Loading...
ST9401-CS 980904REBCON,�N�. September 4, 1998 Mr. Garreth Campbell City of Coppell P.O. Box 478 Coppell, Texas 75019 �_g 9 Re: Denton Tap Road Cottonwood Creek to S.H. 121 Bypass CHANGE ORDER REQUEST The geotextile fabric under the gabions was changed after the bid due to further soils investigation by the soils engineer. The new goetextile, Carthage Mills 30 %, is more expensive than the bid fabric, and we are requesting the following price increase for our Subcontractor, Craig Olden, Inc.: UNIT MATERIAL UNIT QTY PRICE TOTAL Carthage Mills 30% SY 1200 $1.25 $1,500.00 Rebcon Mark -up (10 %) 150.00 Total Request $1,650.00 Thank you for your consideration of this request. Sincerely, REBCON, INC. Robert C. Bibby 1 868 W. NORTHWEST HWY. DALLAS, TEXAS 75220 972/444 -8230