Loading...
DR8902-CS 890925 (2) COPPELL PUBLIC WORKS HEHORANDUM September 25, 1989 TO: Alan Ratliff, City Manager FROM: Steve Goram, Director of Public Wo RE: Warren Ct. Culdesac Staff and the City's Consulting Engineer Firm have determined .that the best possible cost and expeditious construction of the culdesac can be obtained through a change order to the Bethel School Road/Pelican Lane Drainage Improvement project. This would allow us to utilize existing credentials, maintenance bonds, and mobilization costs which can be as much as 10% of the total contract. -The Contractor has agreed to install a 40' radius culdesac constructed out of concrete at a cost of $9,500.00. This will be without curb because of the culdesac's temporary nature. Our Water Department will relocate the existing fire hydrant. Public Works respectfully requests your approval of the attached change order to expedite this project's completion. Finance Director Frank Trando indicated that funds are available from the C.I'.P. revenues. The Contractor can begin work in one week. Thank you. If you have any questions please contact me. SGG/sm -- cc: Wayne Ginn, City EngineerDirector. Frank Trando, Finance Per Birdsall, Street Superintendent