DR9101-AG 920114ITEM CAPTION: Consideration of approving the final acceptance of Oak Trail drainage improvement project, and the final payment (No.3) in the amount of $10,656.68. (J ' (Director'~Si~ture) EVALUATION OF ITEM: STAFF p~... M. Shohr P.E. OTHER REP.: DATE: January 6, 1992 Staff recommends approval. Please see attached memo from Larry Davis, dated 1/2/92. ' dy,- Construction Inspect~ CITY._ DATE BUDGET AMT. AMT +/- BUDGET LEGAL REVIEW BY: AMT. ESTIMATED FINANCIAL REVIEW BY REVIEWED BY CM: MEMO TO: FROM: SUBJECT: DATE: ~. ~eth M. Griffin, P.E., City Engineer hohre Daneshmand, P.E., Civil Engineer '~ n Inspector La~y~onstructio Oak Trail Drainage January 2, 1992 The construction of Oak Trail Drainage improvements has been completed and the final request for payment submitted to Mr. Glenn Hitt with DeShazo, Starek & Tang, Inc. It is my recommendation to accept Mr. Hitt's release letter, (see attached), dated December 20, 1991 and execute final payment to M-S Utilities in the amount of $10,656.68. If I can be of further assistance, please let me know. CLD/bd CC: Ben dela Cruz, Engineering Technician Gary Sieb, Director of Planning and Community Services Glenn Hitt, P.E., DeShazo, Starek & Tang, Inc. Frank Trando, Finance Director OAKMEM December 20, 1991 2 3/9 By:, Engineering ~r. Kenneth Griffin City Engineer c/o Mr. Larry Davis city of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Oak Trail Drainage Improvements Dear Mr. Griffin: Construction of the Oak Trail Drainage Improvements has been completed by the contractor, M-S Utilities of Rock- wall, Texas. We understand final inspection by the City will be December 30, 1991. A copy of the maintenance bond has been sent to you. An executed copy of the ,,Acknowledgement of Payment, Release, Lien Waiver" is enclosed. Also enclosed are two sets of the ,,as-built" plans and the final monthly estimate (No. 3) in the amount of $10,656.68. When the city is satisfied that all items of construction have been satisfactorily completed, we recommend that final payment in the amount of $10,656.68 be made and the contractor released from the contract. Sincerely, Glenn Hitt, P.E. Vice President GH/smb 89256 cc: Mr. Mike Sperling, M-S Utilities STATE OF TEXAS ACKNOWLEDGMENT OF PAYMENT, RELEASE, LIEN WAIVER COUNTY OF DALLAS M-S UTILITIES ("Contractor") for aBd in consideration of the partial payment of the sum of $ 70,176.72 and other Good and valuable consideration in hand paid by ~_.__ City of C0ppeI1 the adequacy and sufficiency of which are hereby acknowledged, does hereby RELEASE and DISCHARGE the City from any and all indebtedness and obligations of any type and character owed to Contractor for the amount listed above in connection width or related to the contract dated April 15 1991 _- ..... For Oak Trail Drain~g~ Improvements This Release shall be deemed to include all claims, known or unknown, which were or could have been asserted by Contractor in connection with said Contract. It shall also be deemed to extinguish any and all liens, express or implied, direct or indirect, which Contractor had or could have asserted in this regard and to release the work, materials and/or equipment and anythinG done or furnished under the Contract free and clear of all liens or claims which the Contractor or any party acting by, through or under the Contractor had or could have asserted. Contractor does hereby agree to indemnify and hold harmless the District from any claims, liability, lien, loss or expenses that may now exist or is hereinafter asserted against the District arising out of or in connection with said work, materials and/or equipment and anythinG done or furnished under the Contract, by any other Party whomsoever furnishing labor, materials and/or services, equipment or otherwise through or under the Contractor. EXECUTED this19 day of December , by a duly authorized officer of the Contractor. By V~ ~_~ , ~ ' Authorized Officer of C~tractor STATE OF TEXAS COUNTY OF DALLAS Before me, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared a corporation~ ~n~w~ To me to be the person and officer whose n:ame is subscribed to the foregoinG instrument and acknowledged to me that he executed the same as the act of said corporation for the purposes and consideration therein expressed, and in the capacity therein stated. Given under my hand and seal of office, this 19 day of .December 19 9__L ~,~:,~ J~ne 24. 19S5 'lPrinted Name '~ih H~I/~ ~ ~'~~ My Commission Expires 6-~-~-Y) MONTHLY ESTIMATE PROJECT: Oak Trail Drainage Improvements ESTIMATE NO: 3 & Final PERIOD ENDING: 12-20-91 OWNER: City of Coppell CONTRACT AMOUNT: $ 78,274.13 CONTRACTOR: M-S Utilities 2045 Kristy Lane TOTAL WORK DONE: $ 78,274.13 Rockwall, Texas 75087 % WORK DONE: 100.0 QUANTITY CONTRACT ITEM DESCRIPTION CONTRACT COMPLETED PRICE AMOUNT 1C Type"X" Inlet 2 Ea 2 $ 1,300.00 ~; 2,600.00 2C 18" Class III RCP 22 LF 22 22.00 484.00 3C 33" Class III RCP 240 LF I 240 57.90 13,896.00 4C 42" Class III RCP 546 LF 546 73.00 39,858.00 5C 48" Classlll RCP 10 LF I 10 83.45 834.50 6C 42" x 18" Wye I Ea 1 550.00 550.00 7C 42" x 42" Wye I Ea 1 675,00 675.00 8C 48" x 42" Wye 1 Ea 1 675.00 675.00 9C 42" x 45-Degree Bend 3 Ea 3 395.00 1,185.00 10C Type "B" Manhole 1 Ea I 2,500.00 2,500.00 11C 5" Reinf. Conc. Driveway 118.9 SY 118.9 38.00 4,518.20 12C Fine Grade Asphalt Pavement 51.9 Ton 51.9 41.25 2,140.88 13C 5" Reinf. Conc. Slope Protec. 10.7 SY 10.7 38.00 406.60 14C Crushed Limestone Base 78.6 CY 78.6 21.00 1,650.60 15C Remove Asphalt Pavement 472 SY 472 1.60 755.20 16C Remove Reinf. Conc. Driveway 118.9 SY 118.9 5.50 653.95 17C Remove 48" Stubout 1 LS 1 200.00 200.00 18C Sawcut 118 LF 118 2.00 236.00 19C Remove & Replace 6' C.L. Fence 10 LF 10 30.00 300.00 20C Remove 5" Slope Protection 10.7 SY 10.7 8.00 85.60 21C Trench Safety Plan 1 LS 1 400.00 400.00 Change Order No. 2 1 LS 1 3,669.60 3,669.60 Engineer ACC~TED~ O~ner TOTAL WORK COMPLY- I ~-L) $ 78,274.13 Less 10% Retainage $ 0.00 Amount Payable $ 78,274.13 Less Previous Payments $ 67,617.45 AMOUNT DUE THIS ESTIMATE $ 10,656.68