Belt Line Trade-LR070102
REED EnGinEERinG
GEOTECHNICAL AND G R CJ U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE DER TEST REPORT
Bel . e Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 166
REG PROJECT NO. 13335
SAMPLE DATE: 12-05-06
TECHNICIAN: J. Smith
PAGE: 1 of 1
CONTRACTOR:
Raymond Construction
Ie
Location
Belt Line Northbound Turn Lane: STA 24+50
Belt Line Northbound Turn Lane: STA 23+75
Location of Sam
Set Number
1
2
Mix Identification
1851
Age@ Total Load
Date Tested Test Ibs.
12-12-06 7 111330
01-02-07 28 147390
01-02-07 28 143410
Hold H
2 9203 12-12-06 7 116290
9203 01-02-07 28 150510
9203 01-02-07 28 153240
9203 Hold H
ecifjed Stren
4500
5140
4120
5320
5420
5370
C Iinder Data
Set Cylinder
No. ID
1 9202
2 9203
Air
Entrainment
3.9
4.2
Ticket
Number
7173805
7173818
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Constructionl
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
f ,IlL
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc
- -
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . FAX [214] 3500019