Loading...
Vista Point 2R-LR070103 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Bouley. Coppell, Texas Age@ Total Load Date Tested Test Ibs. 12-13-06 7 77890 01-03-06 28 102580 01-03-06 28 105430 Hold H 9262 12-13-06 7 87810 3110 9262 01 -03-06 28 101800 3600 9263 01-03-06 28 102100 3610 9263 Ho[d H 9263 12-13-06 7 93130 3300 9263 01-03-06 28 129240 4570 9263 01-03-06 28 133470 4720 9263 Hold H REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 3 Ie Location Paving: 30'N, 10'E from Paving: 30'N, 10'E fro E corner of Bldg. 5 Pavin : 220'N, 20'E fr m SE corner of Bid . 6 Desi n Information Source of Concrete Redi-Mix 2 3 REPORT NO. 78 REG PROJECT NO. 13581 SAMPLE DATE: 12-06-06 TECHNICIAN: E. Barrington PAGE: 1 of 2 ecified Stren 3600 3680 3610 4650 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REPORT NO. 78 REG PROJECT NO. 13581 SAMPLE DATE: 12-06-06 PAGE: 2 of 2 Submitted by: Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Air Entrainment 4.2 4.7 4.4 Ticket Number 181486 181505 181548 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin