Vista Point 2R-LR070103
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Bouley.
Coppell, Texas
Age@ Total Load
Date Tested Test Ibs.
12-13-06 7 77890
01-03-06 28 102580
01-03-06 28 105430
Hold H
9262 12-13-06 7 87810 3110
9262 01 -03-06 28 101800 3600
9263 01-03-06 28 102100 3610
9263 Ho[d H
9263 12-13-06 7 93130 3300
9263 01-03-06 28 129240 4570
9263 01-03-06 28 133470 4720
9263 Hold H
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
2
3
Ie
Location
Paving: 30'N, 10'E from
Paving: 30'N, 10'E fro E corner of Bldg. 5
Pavin : 220'N, 20'E fr m SE corner of Bid . 6
Desi n Information
Source of Concrete
Redi-Mix
2
3
REPORT NO. 78
REG PROJECT NO. 13581
SAMPLE DATE: 12-06-06
TECHNICIAN: E. Barrington
PAGE: 1 of 2
ecified Stren
3600
3680
3610
4650
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019
REPORT NO. 78
REG PROJECT NO. 13581
SAMPLE DATE: 12-06-06
PAGE: 2 of 2
Submitted by:
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Air
Entrainment
4.2
4.7
4.4
Ticket
Number
181486
181505
181548
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin