Loading...
Vista Point 2R-LR061226 REED EnGInEERInG GEOTECHNICAL AND G R CJ U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II ,/ S.H. 121 at MacArthu~ulevard Coppell, Jrias f;fk~~1-' REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001'/ A TTN: Mr. Keith Mahon CONTRACTOR: Bullard Con Location of Sam Set Number 1 Mix Identification NA Date Tested 12-05-06 12-26-06 12-26-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 92730 136940 133970 REPORT NO. 74 REG PROJECT NO. 13581 SAMPLE DATE: 11-28-06 TECHNICIAN: Contractor PAGE: 1 of 1 ecified Stren NA 4800 Ticket Number NA Extranet Distribution: (1) Jackson Shaw Company! Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell!Mr. Keith Marvin Air Entrainment NA Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . FAX [214] 3500019