Vista Point 2R-LR061226
REED EnGInEERInG
GEOTECHNICAL AND G R CJ U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
,/
S.H. 121 at MacArthu~ulevard
Coppell, Jrias
f;fk~~1-'
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001'/
A TTN: Mr. Keith Mahon
CONTRACTOR: Bullard Con
Location of Sam
Set Number
1
Mix Identification
NA
Date Tested
12-05-06
12-26-06
12-26-06
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
92730
136940
133970
REPORT NO. 74
REG PROJECT NO. 13581
SAMPLE DATE: 11-28-06
TECHNICIAN: Contractor
PAGE: 1 of 1
ecified Stren
NA
4800
Ticket
Number
NA
Extranet
Distribution: (1) Jackson Shaw Company!
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell!Mr. Keith Marvin
Air
Entrainment
NA
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MLllnc
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . FAX [214] 3500019