Service Star-LR061218
REPORT OF REINFORCING STEEL OBSERVATION
lrerracan
ConsulllnA EnAlneers & Scientists
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
1214\ 630-1010
Date of Service:
12/18/06
93234
Report No.: 94061329.0053
Project No.: 94061329
Project: Multi-Facility C Gept
(Firest tore)
SWC Hwy. 121 & MacArthur Blvd.
Coppell, TX
Client No.:
Client:
ServiceStar Design Group LLC
5670 Greenwood Plaza Blvd, Suite 300
Greenwood Village, CO 80111
Services:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized:
Civil Sheet Cl.2
Locations/Items Observed: Pavement, Fire Lane & Center Drive Adjacent to Bank Drive- Thru; SHalf of Fire Lane
Test Method:
Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash & Debris Removed X Proper Bar Supports X Lapped Splices X
Number of Bars X Proper Cover/Clearance X
Discrepancies/Comments:
ted at the time of this observation.
I ~/tJf)
Field Results Report To: Israel
Technician: E. Jernigan
Report Distribution:
(1) ServiceStar Design Group LLC
(1) City of Coppell TX
(1) City of Coppell TX
(1) ICI Construction Inc
(1) lei Construction Inc
(1) Pate Engineers
(1) ServiceStar Design Group LLC
(1) Ratliff Group LLC
309acs
This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.