ST9802-CS 99121612/17/99 FRI 10:00 FAX 214 361 5573 HALFF ASSOC INC Q002 Weekly Progress Report Dividend Drive Project Progress Report No. 16 Date: December 16, 1999 Time: 10:00 AM Ternp: 50's Weather: sunny Contr. McMahon Contracting, Inc. Crew: 18 Equip.: dozer, 2 equipment trucks, numerous concrete trucks Halff Associates arrived on site at approximately 10:00 am on December 16 for construction observation. The lid and the rim of the raised manhole near the monument sign have been installed, but the area has not been backfilled and the landscaping/irrigation has not yet been repaired. The eastern circle area and the median opening at the western drive of Gateway Office Center were being paved. The steel was tied together and spaced at 24 inches on center. Chairs were used to raise the steel off the ground. Cylinders had been made for testing and Reed Engineering was on site. Ogie, the superintendent for McMahon Contracting, said that they were going to finish pouring the concrete on Saturday morning, December 18. I told Jesus, the forman for McMahon Contracting, to saw and seal the joints under the future brick pavers. The storm manhole at STA 9 +09 needs to be raised to grade and cleaned out; it is full of dirt. Two of the four curb inlet tops were being constructed. Extra precautions need to be made at all the inlet locations to ensure that silt is not entering the storm sewer system. According to Jesus, the entire project should be completed by Wednesday, December 22, 1999. It has been a pleasure working with you on this project. If you have any comments or questions, please contact me by phone at (214) 346 -6246 or by fax at (214) 361 -5573. Todd Jackson HALFF ASSOCIATES, INC. cc: Robert McCann, Catellus Development Corporation Bruce Roebuck, McMahon Contracting, Inc.