Loading...
ST9802-CS 99100510/0 FE ED 16:47 FAX 214 361 5573 HALFF ASSOC INC Q002 Weekly Progress Report Dividend Drive Project Progress Report No. 12 Date: October 5, 1999 Time: 10:30 AM Temp: 70's Weather: sunny Contr. McMahon Contracting, Inc. Crew: 6 Equip.: dozer, sheep's foot roller, grader Halff Associates arrived on site at approximately 10:30 am on October 5 for construction observation. There have been no changes made to the left turn lane area on Freeport Parkway. The irrigation system and the landscaping near the monument sign at the intersection of Freeport Parkway and Dividend Drive have not yet been repaired, but the area has been backfilled to within 3 ft. of the existing ground. The storm manhole lids at STA 2 +43 and STA 9 +09 — Line A need to be "storm sewer" lids, not "water" lids. The grader was spreading dirt along the proposed roadway to bring it up to proposed grade. A crew was backfilling and compacting at the end of the 16" water line. A crew was cleaning dirt and water out of the first sanitary sewer manhole at STA 1 +14. Chris Waddle with North Texas Contracting stated that the water line has passed all of its tests. I need a copy of these test results from North Texas. Chris also stated that the first sanitary sewer joint downstream of the manhole at STA 5 +51 has dropped down slightly at the manhole. I will discuss this with Garreth Campbell to determine if any action is required to fix the situation. It has been a pleasure working with you on this project. If you have any comments or questions, please contact me by phone at (214) 346 -6246 or by fax at (214) 361 -5573. Todd Jackson HALFF ASSOCIATES, INC. cc: Robert McCann, Catellus Development Corporation Bruce Roebuck, McMahon Contracting, Inc.