Loading...
ST9802-CS 99091709/20/99 MON 08:34 FAX 214 361 5573 HALFF ASSOC INC 16002 Weekly Progress Report Dividend Drive Project Progress Report No. 8 Date: September 17, 1999 Time: 2:00 PM Temp: 90's Weather: sunny Contr. McMahon Contracting, Inc. Crew: 8 Equip.: backhoe, dozer, sheep's foot roller Halff Associates arrived on site at approximately 2:00 pm on September 17 for construction observation. The irrigation system and the landscaping near the monument sign at the intersection of Freeport Parkway and Dividend Drive have not yet been repaired. Robert McCann of Catellus expressed his desire to have this area repaired and backfilled as soon as possible. However, there is still a problem with the existing sanitary sewer under Freeport Parkway and a more extensive investigation is needed to determine the problem. I will get in touch with Garreth Campbell to discuss the problem with the sanitary sewer line. I am trying to avoid having the contractor repair the irrigation system, landscaping, and backfilling the area just to have it dug up again to repair the sewer. The contractor was chlorinating the 16" water line. The contractor said that the pressure test on the 16" water line was performed and it passed. The contractor said that they reinstalled the connection between the 16" and 12" water line that was previously leaking. The concrete has been poured for the "y" inlet. The top of the "y" inlet still needs to be constructed. The two western most curb inlets have been poured with concrete and the two eastern most curb inlets were being formed. The storm sewer manholes still need to be constructed. The contractor still needs to install the PVC sleeves; however, he is waiting on construction staking from McMahon. It has been a pleasure working with you on this project. If you have any comments or questions, please contact me by phone at (214) 346 -6246 or by fax at (214) 361 -5573. Todd Jackson HALFF ASSOCIATES, INC. cc: Robert McCann, Catellus Development Corporation Bruce Roebuck, McMahon Contracting, Inc.