ST9802-CS 99082708/30/99 NON 08:46 FAX 214 361 5573 HALFF ASSOC INC Weekly Progress Report Dividend Drive Project Progress Report No. 5 Date: August 27, 1999 Time: 3:30 PM Temp: 100's Weather: sunny Contr. McMahon Contracting, Inc. Crew: 4 Equip.: 2 backhoes, 2 dozers, sheep's foot roller Halff Associates arrived on site at approximately 3:30 pm on August 27 for construction observation. The irrigation system and the landscaping near the monument sign at the intersection of Freeport Parkway and Dividend Drive have not yet been repaired. The entire storm sewer trunk main has been installed except the manholes. Approximately 2 joints of the storm sewer laterals on the north side of the main line have been installed. Approximately one -third of the water main has been installed. The water line is being backfilled with sand material then native material. Caution tape is being laid in the trench within the native backfill layer. Bends, tees, and valves are being installed. They seem to be bolted on correctly and wrapped in plastic. Erosion control methods (plywood) were being used to block exposed RCPs at the end of the work day. It has been a pleasure working with you on this project. If you have any comments or questions, please contact me by phone at (214) 346 -6246 or by fax at (214) 361 -5573. Todd Jackson HALFF ASSOCIATES, INC. la 002 cc: Robert McCann, Catellus Development Corporation Bruce Roebuck, McMahon Contracting, Inc.