Loading...
ST9802-CS 99073007/30/99 FRI 12:50 FAX 214 361 5573 HALFF ASSOC INC 1002 Weekly Progress Report Dividend Drive Project Progress Report No. 1 Date: July 30, 1999 Time: 8:00 AM Temp; 90's Weather: sunny Contr. McMahon Contracting, Inc. Crew: 0 Equip.: backhoe, dozer Halff Associates arrived on site at approximately 8:00 am on July 30 for construction observation. The top soil has been scraped and preliminary grading has occurred along the road alignment. Excess material has been stockpiled on site. The site has been staked for construction. A silt fence has been installed around the drop inlet at the northeast corner of Freeport Parkway and Dividend Drive. The vegetation has been removed and preliminary grading has been done in the median of Freeport Parkway for the left turn lane. It has been a pleasure working with you on this project. If you have any comments or questions, please contact me by phone at (214) 346 -6246 or by fax at (214) 361 -5573. Todd Jackson HALFF ASSOCIATES, INC. cc: Robert McCann, Catellus Development Corporation Bruce Roebuck, McMahon Contracting, Inc.