Loading...
ST9802-LR 991223REEn 1 Er7GIr1EERlM M GEOTECHNICAL AND G R O U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Dividend Drive Freeport Parkway, North of Highway 635 Coppell, Texas REPORTED TO: Catellus Development 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT NO. 17 REG PROJECT NO. 5758 SAMPLE DATE: 12 -16 -99 TECHNICIAN: P.Olegario CONTRACTOR: McMahon Contracting, Inc. Location of Sample 1 Paving: West Bound at STA. 11 +35 40/300 2 Paving: West Bound at STA. 5 +50 to STA. 6 +55 140/300 3 Pavino: East Bound at STA. 11 +35 to STA. 12 +38 200/300 Design Information 3600 inder Data 1 1040 5.00 9:45 AM 44 2 1041 6.50 12:30 PM 59 3 1042 3.50 2:20 PM 59 Distribution: (1) Catellus Development/ Mr. Robert McCann (1) City of Coppell /Mr. Garth Campbell (1) Halff Associates /Mr. Todd Jackson (1) McMahon Contracting/ Mr. Bruce Roebuck 57 N/A 7081067 61 N/A 14116266 67 N/A 14116285 Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/rt 2424 STUTZ DR. • SUITE 400 • DALLAS, TX 75235 . TEL [214] 350 5600 • FAX (214) 350 0019 Lattimore Test Results