ST9802-LR 991214FREEa I Er1GIr1E FEE FRIr M
GEOTECHNICAL AND G FR 1:3 U F=
ENVIRONMENTAL CONSULTANTS
REPORT OF FIELD DENSITY TESTS
Dividend Drive
Freeport Parkway, North of Highway 635
Coppell, Texas
REPORTED TO: Catellus Development REPORT NO. 13
4545 Fuller Drive, Suite 105 REPORT DATE: 12 -14 -99
Irving, Texas 75038 REG PROJECT NO. 5758
ATTN: Mr. Robert McCann TECHNICIAN: R. Bullion
PAGE: 1 of 1
CONTRACTOR: McMahon Contracting, Inc.
1 D -698
Dark gray clay
25.5
88.5
2 D -698
Yellowish brown clay
27.0
88.5
3 D -698
Light brown and dark brown clay
27.5
89.5
4 D -698
Yellowish brown clay (lime treated)
24.0
90.5
57
11 -10 -99 STA 3 +00, 8'S of center line
0.0
89.7
28.2
4
99.1
58
STA 3 +00, 5'N of center line
0.0
87.8
31.3
4
97.0
59
STA 6 +00, 5'S of center line
0.0
88.7
28.9
4
98.0
60
STA 6 +00, 10'N of center line
0.0
90.5
29.6
4
100.0
61
STA 9 +00, 10'S of center line
0.0
87.7
28.6
4
96.9
62
STA 9 +00, 5'N of center line
0.0
90.0
29.4
4
99.4
63
STA 12 +00, 10'S of center line
0.0
88.8
30.6
4
98.1
64
STA 12 +00, 10'N of center line
0.0
89.5
30.0
4
98.9
Comments: Where tested, materials were in compliance with project specifications.
Distribution: (1) Catellus Development/
Mr. Robert McCann
(1) City of Coppell /Mr. Garth Campbell
(1) Halff Associates /Mr. Todd Jackson
(1) McMahon Contracting/
Mr. Bruce Roebuck
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed ByOriginal Signed By
Ronald F. Reed, P.E.
BW /cav
2424 STUTZ DR. • SUITE 400 • DALLAS, TX 75235 . TEL [214] 350 5600 . FAX [214] 350 0019