ST9802-LR 991209FREED 1 E
GEOTECHNICAL AND G R O U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Dividend Drive
Freeport Parkway, North of Highway 635
Coppell, Texas
REPORTED TO: Catellus Development
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO. 15
REG PROJECT NO. 5758
SAMPLE DATE: 12 -02 -99
TECHNICIAN: D. Rico
CONTRACTOR: McMahon Contracting, Inc.
Location or sample
1 Paving:
150'W of Intersection Dividend Dr. /Freeport
10/500
2 Paving:
270'E of Intersection Dividend Dr. /Freeport
120/500
3 Paving:
530'E of Intersection Dividend Dr. /Freeport
240/500
4 Paving:
620'E of Intersection Dividend Dr. /Freeport
320/500
5 Paving:
790'E of Intersection Dividend Dr. /Freeport
430/500
Design Information
Lattimore 38 3000
Tact Results
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 350 5600 . FAX [214] 350 0019
Cylinder Data
lifid
.........
ITT.
.............
.....
. .
.... .. ..
X:
w r
....
..... ...... ..... ...
N UM f
742
4.00
8:00 AM
60
65
4.0
6112711
2 743
3.00
8:45 AM
61
65
3.0
8112721
3 744
2.50
10:50 AM
65
70
3.5
6112747
4 745
2.00
12:45 PM
68
71
4.25
6112772
5 746
3.00
3:00 PM
70
70
4.0
6112799
Distribution: (1) Catellus Development/
Mr. Robert McCann
(1) City of Coppell/Mr. Garth Campbell
(1) Halff Associates/Mr. Todd Jackson
(1) McMahon Contracting/
Mr. Bruce Roebuck
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/rt