Loading...
ST9802-LR 991209FREED 1 E GEOTECHNICAL AND G R O U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Dividend Drive Freeport Parkway, North of Highway 635 Coppell, Texas REPORTED TO: Catellus Development 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT NO. 15 REG PROJECT NO. 5758 SAMPLE DATE: 12 -02 -99 TECHNICIAN: D. Rico CONTRACTOR: McMahon Contracting, Inc. Location or sample 1 Paving: 150'W of Intersection Dividend Dr. /Freeport 10/500 2 Paving: 270'E of Intersection Dividend Dr. /Freeport 120/500 3 Paving: 530'E of Intersection Dividend Dr. /Freeport 240/500 4 Paving: 620'E of Intersection Dividend Dr. /Freeport 320/500 5 Paving: 790'E of Intersection Dividend Dr. /Freeport 430/500 Design Information Lattimore 38 3000 Tact Results 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 350 5600 . FAX [214] 350 0019 Cylinder Data lifid ......... ITT. ............. ..... . . .... .. .. X: w r .... ..... ...... ..... ... N UM f 742 4.00 8:00 AM 60 65 4.0 6112711 2 743 3.00 8:45 AM 61 65 3.0 8112721 3 744 2.50 10:50 AM 65 70 3.5 6112747 4 745 2.00 12:45 PM 68 71 4.25 6112772 5 746 3.00 3:00 PM 70 70 4.0 6112799 Distribution: (1) Catellus Development/ Mr. Robert McCann (1) City of Coppell/Mr. Garth Campbell (1) Halff Associates/Mr. Todd Jackson (1) McMahon Contracting/ Mr. Bruce Roebuck Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/rt