ST9802-LR 991007REEL7 I E
GEOTECHNICAL AND G R O U P
ENVIRONMENTAL CONSULTANTS
REPORT OF FIELD DENSITY TESTS
Dividend Drive
Freeport Parkway, North of Highway 635
Coppell, Texas
REPORTED TO: Catellus Development
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO. 8
REPORT DATE: 10 -07 -99
REG PROJECT NO. 5758
TECHNICIAN: B. Ray
PAGE: 1 of 1
CONTRACTOR: McMahon Contracting, Inc.
1 D -698 Dark gray clay
25.5
88.5
2
D -698 Yellowish brown clay
27.0
88.5
3
D-698 Light brown and dark brown clay
27.5
89.5
Depth
Betow°
Fllt
Fief
Test
Fl S G.
Oenslty
fiAoasture
Qroctor,
Ganpc
Nar
..date
Location
fe`+t
c
°/n
ib
Lerel
50
,
09 -10 -99 Main Water Line: 920'E (1)
0.0
87.4
30.4
3
3
97.7
98.0
51
Main Water Line: 920 (1)
1.0
87.7
29.7
52
Main Water Line: 920 (1)
2.0
87.7
29.8
3
98.0
53
Main Water Line: 920'E (1)
3.0
86.9
27.4
3
97.1
54
Main Water Line: 1209 (1)
0.0
85.1
28.4
3
3
95.1
95.4
55
Main Water Line: 1209'E (1)
1.0
85.4
29.6
56
Main Wa ter Line: 1209'E (1)
2.0
87.7
29.0
3
98.0
Comments: Where tested, materials were in compliance with project specifications.
Footnote: (1) Measurements referenced from Freeport Pkwy.
Distribution: (1) Catellus Development/ Submitted by:
Mr. Robert McCann
(1) City of Coppell /Mr. Garth Campbell REED ENGINEERING GROUP, INC.
(1) Halff Associates /Mr. Todd Jackson
(1) McMahon Contracting/ Original Signed ByOriginal Signed By
Mr. Bruce Roebuck
Ronald F. Reed, P.E.
RFR /sa /je
2424 STUTZ DR. • SUITE 400 • DALLAS, TX 75235 • TEL [214] 350 5600 • FAX [214] 350 0019