Loading...
ST9802-LR 990909F=4EEa 1 E=MMIMEEFaIMM GEOTECHNICAL AND G F4 O LJ F° ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Dividend Drive Freeport Parkway, North of Highway 635 Coppell, Texas REPORTED TO: Catellus Development 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT NO. 5 REPORT DATE: 09 -09 -99 REG PROJECT NO. 5758 TECHNICIAN: B. Ray PAGE: 1 of 1 CONTRACTOR: McMahon Contracting, Inc. 1 D -698 Dark gray clay 25.5 88.5 2 D -698 Yellowish brown clay 27.0 88.5 3 D -698 Light brown and dark brown clay 27.5 89.5 28 08 -19 -99 Sanitary Line A STA 6 +40 3.0 85.4 27.4 1 96.5 29 Sanitary Line A STA 6 +40 2.0 84.9 26.9 1 95.9 30 Sanitary Line A STA 7 +80 3.0 86.7 30.4 2 98.0 31 Sanitary Line A STA 7 +80 2.0 84.0 30.6 2 94.9 32 Sanitary Line A STA 6 +60 1.0 84.6 31.7 2 95.6 33 Sanitary Line A STA 7 +20 1.0 84.9 31.8 2 95.9 34 Sanitary Line A STA 6 +40 0.0 85.9 30.4 2 97.1 35 Sanitary Line A STA 7 +50 0.0 86.9 29.8 2 98.2 36 Storm Line A, STA 5 +50 2.0 84.6 28.4 2 95.6 37 Storm Line A, STA 5 +50 1.0 87.1 28.6 2 98.4 38 Storm Line A, STA 5 +50 0.0 86.9 27.9 2 98.2 39 08 -20 -99 Storm Line A, STA 7 +00 3.0 84.9 30.4 3 94.9 40 Storm Line A, STA 7 +00 2.0 85.6 27.6 3 95.6 41 Storm Line A, STA 7 +00 1.0 85.7 28.1 3 95.8 42 Storm Line A, STA 7 +00 0.0 85.0 28.4 3 95.0 43 Storm Line A, STA 8 +25 3.0 87.0 29.6 3 97.2 44 Storm Line A, STA 8 +25 2.0 88.9 28.4 3 99.3 45 Storm Line A, STA 8 +25 1.0 84.8 31.8 3 94.7 46 Storm Line A, STA 8 +25 0.0 85.7 31.6 3 95.8 Comments: Where tested, materials were in compliance with project specifications. Distribution: (1) Catellus Development/ Submitted by: Mr. Robert McCann (1) City of Coppell /Mr. Garth Campbell REED ENGINEERING GROUP, INC. (1) Halff Associates /Mr. Todd Jackson (1) McMahon Contracting/ Original Signed By Mr. Bruce Roebuck Ronald F. Reed, P.E. BW /rt/je 2424 STUTZ DR. • SUITE 400 • DALLAS, TX 75235 • TEL [214] 350 5600 • FAX [214] 350 0019