Loading...
DR8902-CS 890801 (2) GINN, INC. CONSULTING ENGINEERS · Mr. Russell Doyle, P.E UG City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Bethel School Road/Pelican Lane Drainage Dear Mr. Doyle: Mr. Steve Widner has indicated that he will not grant the 10' easement necessary for the construction of the storm sewer outfall on Lot 15. He has indicated that he will work with us on granting a smaller easement (6 or 7 feet) provided that the City pay for extending the pipe to the rear of the property. It is estimated that this will cost an additional $3,000-$4,000. Please note that we did not extend the pipe to the rear of any of the other properties, such as Mr. Bain's. It is our understanding that Mr. Widner will contact you or Mr. Ratliff regarding this matter. Until such time as this is resolved, we have notified the Contractor "hold" construction of the particular storm sewer outfall. Sincerely, H. Wayne Ginn, P.E. cc: Alan D. Ratliff Gabe Favre File 89420 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900