Loading...
St Andrews Est-CS070105T H E C i T Y O F COPPELL ~`,~, _ F k A , $ 9 S January 5, 2007 Terry Holmes Holmes Builders 2629 Dickerson Carrollton TX 75007 RE: Construction of Barrier-Free Ramps St Andrews Estates Dear Mr. Holmes: There are two months remaining on the term of infrastructure maintenance bonds issued for the referenced subdivision. In a letter dated December 20, 2004, you were requested to adhere to the following conditions as a requirement of final acceptance: 1. The City will allow construction of the two interior ramps to be delayed until the homes are built on those hvo lots. 2. The ramps adjacent to Deforest Road must be constructed before final acceptance of the infrastructure portion of the project. This activity should take place so that the maintenance bond will be in effect for those facilities during the 2-year bond period. 3. When the ramps for Lots 18 and 19 are to be constructed, please call this office for inspection services. 4. "The ramps at the intersection of Stonewick Ln shall be constructed within the 2-year maintenance period. If any of the subject ramps have not been constructed, please make arrangements to finish such construction at this time. If you have any questions or comments, please contact me at your convenience. Sinc ; , i ------ Y V ' cc: Greg Jones, Chief Building Official Larry Davis Construction Inspector Office: 972-304-3684 Fax: 972-304-3570 255 PARKWAY * P.O.BOX 9478 * COP PE LL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673