Loading...
Stoneleigh (Fairway)-LR 980608A ALPHA TESTING, INC. MECHANICAL 2209 Wisconsin St. STABILIZATION / MODIFICATION Suite 100 Dallas, Texas 75229 FINAL MIX (972) 620 -8911 TESTED FOR FIRST WORTHING COMPANY DALLAS, TEXAS DATE 06/08/98 PROJECT STONELEIGH AT RIVERCHASE COPPELL, TEXAS FAIRWAY DRIVE Area of Work: OUR REPORT NO. 97060 -190A Date cement E! lime /initially applied n 6 n _' Average final compacted depth: 6 inches. Date of final mixing 06/08/98 Sample Location: STA. '? +50 FAIRWAY DRIVE STA. ?tc2 FAIRWAY DRIVE STA. - -6" 1 AIRWAY D Remarks: COMPU )ATA— CG0108 i cH A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 9721620 -8911 - 9721263 -4937 (Metro) FAX: 9721406 -8023 TESTED FOR FIRST WORTHING COMPANY DALLAS, TEXAS PROJECT STONELEIGH AT RIVERCHASE COPPELL, TEXAS TEST DATA: REPORT OF FIELD COMPACTION TESTS DATE 6/8/98 OUR REPORT NO. 97060 -188A TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT' 323 6/8198 FG 4 20.6 100 20.8 97 97 3 -A TEST LOCATION: 323 (STREET AT STATION #1 +50 OF FAIRWAY DRIVE 1 FILL A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS LNE STA.BIL.IZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS d CEMEN' TREATED D RETEST Geotechnical Engineenng g Conshuclion Materials Testing W EnOronmental Engineering 0 Consufhng A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 9721620 -8911 - 9721263 -4937 (Metro) FAX: 9721406 -8023 TESTED FOR FIRST WORTHING COMPANY DALLAS, TEXAS PROJECT STONELEIGH AT RIVERCHASE COPPELL, TEXAS TEST DATA: REPORT OF FIELD COMPACTION TESTS DATE 6/8/98 OUR REPORT NO. 97060 -188 TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* 316 1 6/8/98 FG 4 20.6 100 20.6 99 99 3 -A 317 6/8/98 FG 4 20.6 100 21.7 95 95 3 -A 318 6/8/98 FG 4 20.6 100 24.3 95 95 3 -A 319 6/8/98 FG 4 20.6 100 23.1 95 95 3 -A 320 6/8/98 FG 4 20.6 100 20.8 96 96 3 -A 321 6/8/98 FG 4 20.6 100 21.6 98 98 3 -A 322 6/8/98 FG 4 20.6 100 20.7 100 100 3 -A TEST LOCATION- 316 STREET AT STATION #8 +15 OF FAIRWAY DRIVE 317 STREET AT STATION #7 +50 OF FAIRWAY DRIVE 318 STREET AT STATION #6 +50 OF FAIRWAY DRIVE 319 STREET AT STATION #5 +79 OF FAIRWAY DRIVE 320 STREET AT STATION #4 +50 OF FAIRWAY DRIVE 321 STREET AT STATION #3 +50 OF FAIRWAY DRIVE 322 STREET AT STATION #2 +50 OF FAIRWAY DRIVE i FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 -[ME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D. RETEST Geotechnlcal Engineering 0 COn5hUClion Materials Tesflng m Environmental Engineering m c.onsumng