Loading...
Vista Point 2R-LR070105 REECl~EnGln GEOTECHNICAL ENVIRONMENTAL CONSU REPORT OF REINFORCING STEEL PLACEMENT OBSERVAl Vista Point II, Phase II f S.H. 121 at MacArthur Bou yard Coppell, Texas REPORT NO. 87 REPORT DATE: 01-05-07 REG PROJECT NO. 13581 DATE OBSERVED: 12-27-06 TECHNICIANS: L. Barnard & B. Steadman REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Sidewalk retaining wall: 5-17'N, 3'W-40'E from N.W. corner of Building 4. I Reference Plans or Notes Used: I Sheet S-7 lUst Deviations Noted: 11) #4 bars at O.C.E.W. not present. 2) Weep holes (PVC) 4 feet O.C. not present. The noted deviations were reported to: Contractor x IThe noted deviations were not corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/rs I ---+- --- ___1____ 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . fAX [214] 3500019