Vista Point 2R-LR070105
REECl~EnGln
GEOTECHNICAL
ENVIRONMENTAL CONSU
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVAl
Vista Point II, Phase II f
S.H. 121 at MacArthur Bou yard
Coppell, Texas
REPORT NO. 87
REPORT DATE: 01-05-07
REG PROJECT NO. 13581
DATE OBSERVED: 12-27-06
TECHNICIANS: L. Barnard &
B. Steadman
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
I Items Observed:
I Sidewalk retaining wall: 5-17'N, 3'W-40'E from N.W.
corner of Building 4.
I Reference Plans or Notes Used: I Sheet S-7
lUst Deviations Noted:
11) #4 bars at O.C.E.W. not present.
2) Weep holes (PVC) 4 feet O.C. not present.
The noted deviations were reported to: Contractor
x IThe noted deviations were not corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Extranet
Distribution: (1) Jackson Shaw Companyl
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Ronald F. Reed, P.E.
BW/rs
I
---+- ---
___1____
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . fAX [214] 3500019