Loading...
Vista Point 2R-LR070104 REED I EnGinEERinG '-~~----l-'---"- GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 89 REG PROJECT NO. 13581 SAMPLE DATE: 12-28-06 TECHNICIAN: TSIT PAGE: 1 of 2 CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 3 4 Ie Location Paving: 15'N, 65'E from NW corner of Bldg. 4 Paving: 100'N, 55'W from SW corner of Bldg. 4 Paving: 115'S, TW from NW corner of Bldg. 4 Pavin : 75'S, 50'W from NW corner of Bid . 4 Desi n Information Source of Concrete Mix Identification ecified Stren Redi-Mix 23601504 3600 Age@ Total Load Date Tested Test Ibs. 01-04-07 7 91630 01-25-07 28 01-25-07 28 Hold H 2 9820 01-04-07 7 93800 3320 9820 01-25-07 28 9820 01-25-07 28 9820 Hold H 3 9821 01-04-07 7 91110 3220 9821 01-25-07 28 9821 01-25-07 28 9821 Hold H 4 9822 01-04-07 7 89850 3180 9822 01-25-07 28 9822 01-25-07 28 9822 Hold H 2424 STUTZ DR . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REPORT NO. 89 REG PROJECT NO. 13581 SAMPLE DATE: 12-28-06 PAGE: 2 of 2 C linder Oata Set Cylinder No. 10 1 9819 2 9820 3 9821 4 9822 Submitted by: Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Air Entrainment 4.3 4.5 4.6 4.0 Ticket Number 569115 182782 182805 182817 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin