~' NATIONAL FLOOD INSURANCE PROGRAM
FEMA NATIONAL SERVICE PROVIDER
~lgND $~GJ
October 2, 2006
Mr. Brandon A. Leudke, E.LT.
Halff Associates, Inc.
8616 Northwest Plaza Drive
Dallas, TX 75225
IN REPLY REFER TO:
Case No.: 06-06-BE95P
Communities: Cities of Coppell, Dallas,
and Irving, TX
Community Nos.: 480170, 480171, and 480180
316-AD
Dear Mr. Leudke:
This is in regard to your request dated July 10, 2006, that the Department of Homeland Security's Federal
Emergency Management Agency (FEMA) issue a revision to the Flood Insurance Rate Map (FIRM) for
Dallas County, Texas and Incorporated Areas. Pertinent information about the request is listed below.
Identifier:
Flooding Source:
FIRM Panel(s) Affected:
158.6-Acre Billingsley Tract
Grapevine Creek
4811300155 J
The data required to complete our review, which must be submitted within 90 days of the date of this
letter, are listed on the enclosed summary.
If we do not receive the required data within 90 days, we will suspend our processing of your request.
Any data submitted after 90 days will be treated as an original submittal and will be subject to all
submittallpayment procedures, including the flat review and processing fee for requests of this type
established by the current fee schedule. A copy of the notice summarizing the current fee schedule, which
was published in the Federal Register, is enclosed for your inforration.
FEMA receives a very large volume of requests and cannot maintain inactive requests for an indefinite
period of time. Therefore, we are unable to grant extensions for the submission of required data/fees for
revision requests. If a requester is informed by letter that additional data are required to complete our
review of a request, the data/fee must be submitted within 90 days of the date of the letter. Any fees
already paid will be forfeited for any request for which the requested data are not received within 90 days.
3601 EisenhowerAvenue, Alexandria, VA 2230-6425 PH:i-877-FEMA MAP FX: 703.960.9125
The Mapping on Demand Team, under contract with the Federal Emergency Management Agency, is the
National Service Provider for the National Flood Insurance Program
2
If you have general questions about your request, FEMA policy, or the National Flood Insurance Program,
please call the FEMA Map Assistance Center, toll free, at 1-877-FEMA MAP (1-877-336-2627). If you
have specific questions concerning your request, please call the Revisions Coordinator for your State,
M. Saleem Ashraf, Ph.D., P.E., who maybe reached at (703) 960-8800, ext. 5229.
Sincerely,
Sheila M. Norlin, CFM
National LOMC Manager
Michael Baker Jr., Inc.
Enclosures
cc: Mr. Kenneth M. Griffm, P.E.
Director of Engineering and Public Works
Engineering Department
City of Coppell
Mr. Steve Parker
Floodplain Manager
City of Dallas
Mr. Garry Fennell
Senior Civil Engineer
City of Irving
Mr. Henry Billingsley
Partner
Billingsley & Co.
Mr. Walter E. Skipwith, P.E.
Vice-President
Halff Associates, Inc.
O~4j r~F,y
°' NATIONAL FLOOD INSURANCE PROGRAM
~ ~ FEMA NATIONAL SERVICE PROVIDER
~~~'1ND SEG~4
Summary of Additional Data Required to Support a
Letter of Map Revision
Case No.: 06-06-BE95P
Communities: Cities of Coppell, Dallas,
and Irving, TX
Requester: Mr. Brandon Leudke, E.I.T.
Community Nos.: 480170, 480171, and 480180
The issues listed below must be addressed before we can continue the review of your request.
1. Our detailed review of the hydraulic models for the area along Grapevine Creek revealed that the
discharge values decrease in the downstream direction at Cross Sections 13620 and 17600. Please
provide a justification for these changes in discharge.
2. Our review of the post-project conditions model revealed an increase in the elevation of the flood
having a 1-percent chance of being equaled or exceeded in any given year (base flood) at Cross
Section 15650, when compared to the pre-project conditions model. The construction of a project in
the effective regulatory floodway may not increase the Base Flood Elevations by more than 0.00 foot,
according to Paragraph 60.3(d)(3) of the National Flood Insurance Program regulations. Please revise
the pre-project conditions model so that there is no increase at any cross section in the post-project
conditions model.
3. The post-project conditions floodway analysis for Grapevine Creek contains a negative surcharge of
0.05 foot at Cross Section 11300. Please revise the model to eliminate this negative surcharge.
4. Our review of the HEC-RAS model revealed that encroachment stations are located outside the base
floodplain at several cross sections. Please review and revise the locations of the bank stations and
encroachment stations, so that the encroachment stations are inside the floodplain in the HEC-RAS
model.
5. Please extend the post-project conditions floodplain and floodway boundary delineations on the
topographic work map to show the tie-ins to the effective floodplain and floodway boundary
delineations at the upstream and downstream limits of the area of revision.
Please send the required data directly to us at the address shown at the bottom of this page. For
identification purposes, please include the case number referenced above on all correspondence.
3601 Eisenhower Avenue, Alexandria, VA 223046425 PH:1-877-FEMA MAP FX: 703.960.9125
The Mapping on Demand Team, under contract with the Federal Emergency Management Agency, is the
National Service Provider for the National Flood Insurance Program
o~es~~F~
~'~ ~ °~ Federal Emergency Management Agency
5 -- ~
°~ 4 Washington, D.C. 20472
~l9ND 5~~
FEE SCHEDULE FOR PROCESSING REQUESTS FOR MAP CHANGES
'This notice contains the fee schedule for processing certain types of requests for changes to National Flood
Insurance Program (NFIP) maps. The fee schedule allows FEMA to further reduce the expenses to the NFIP
by more fully recovering the costs associated with processing conditional and final map change requests. The
fee schedule for map changes is effective for all requests dated October 30, 2005, or later and supersedes the
fee schedule that was established on September 1, 2002.
To develop the fee schedule for conditional and final map change requests, FEMA evaluated the actual costs of
reviewing and processing requests for Conditional Letters of Map Amendment (CLOMAs), Conditional Letters of
Map Revision -Based on Fill (CLOMR-Fs), Conditional Letters of Map Revision (CLOMRs), Letters of Map
Revision -Based on Fill (LOMR-Fs), Letters of Map Revision (LOMRs), and Physical Map Revisions (PMRs).
Based on our review of actual cost data for Fiscal Years 2004 and 2005, FEMA has established the following
review and processing fees, which are to be submitted with all requests that are not otherwise exempted under
44 CFR 72.5.
Fee Schedule for Requests for CLOMAs, CLOMR-Fs, and LOMR-Fs
Request for single-lot/single-structure CLOMA and CLOMR-F ........................................................ $500
Request for single-lot/single structure LOMR-F ................................................................................ $425
Request for single-lot/single-structure LOMR-F based on as-built
information (CLOMR-F previously issued by us) ........................................................................ $325
Request for multiple-lot/multiple-structure CLOMA ......................................................................... $700
Request for multiple-lot/multiple-structure CLOMR-F and LOMR-F ............................................... $800
Request for multiple-lotlmultiple-structure LOMR-F based on as-built
information (CLOMR-F previously issued) ................................................................................. $700
Fee Schedule for Requests for CLOMRs
Request based on new hydrology, bridge, culvert, channel, or combination
of any of these ............................................................................................................................$4,000
Request based on levee, berm, or other structural measure ............................................................. $5,000
Fee Schedule for Requests for LOMRs and PMRs
Requesters must submit the review and processing fees shown below with requests for LOMRs and PMRs that
are not based on structural measures or alluvial fans.
Request based on bridge, culvert, channel, or combination thereof ................................................. $4,400
Request based on levee, berm, or other structural measure ............................................................. $6,000
Request based on as-built information submitted as follow-up to CLOMR .................................... $4,000
Fees for CLOMRs, LOMRs, and PMRs Based on Structural Measures on Alluvial Fans
FEMA has revised the initial fee for requests for CLOMRs and LOMRs based on structural measures on
alluvial fans to $5,600. FEMA will also continue to recover the remainder of the review and processing costs
by invoicing the requester before issuing a determination letter, consistent with current practice. The
prevailing private-sector labor rate charged to FEMA ($60 per hour) will be used to calculate the total
reimbursable fees.
Payment Submission Requirements
Requesters must make fee payments for non-exempt requests before we render services. This payment must
be in the form of a check or money order or bycredit card payment. Please make all checks and money orders
in U.S. funds payable to the National Flood Insurance-Program. We will deposit all fees collected to the
National Flood Insurance Fund,. which is the source of funding for providing this service.