Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST0502A-CS050131
R1W width (ft) street length (ft) paving width (ft) avg. cut (ft) sidewalk (ft) R1W needed (SF) S/OS02.A Freeport Parkway Ruby to Sandy Lake 95 4050 50 2.5 5 45,000 Quanitv Cost Total Excavation (CY) 35625 $10.0 $356,250 Stabilized sub grade (SY) 24300 $2.5 $60,750 Lime (tons) 547 $100.0 $54,675 Concrete paving (SY) 22500 $30.0 $675,000 Sidewalk (SF) 40500 $4.0 $162,000 $1,308,675 Mobilization & R1W prep. 8% $104,694 Drainage 30% $392,603 Incidentals 35% $458,036 $2,264,008 Bridge $1,300,000 Right of way 45000 $4.0 $180,000 Engineering Design $550,000 Geotechnical $50,000 $4,344,008 Contingency 15% $651.601 Total Cost $4.995.609 NCTCOG participation per 02/05 MOU $3,368,000 Total City Cost $1,627,609 I Budget # - $1,800,000 rev. \13 \105 freeport ruby to sandy lake cip.xls 1/31/05