Loading...
ST0502B-EM051210 SJOSO~E> .. Freese and Nichols OPINION OF PROBABLE CONSTRUCTION COST Freeport Parkway 6 Lanes North of Sandy Lake & 4 Lanes South of Sandy Lake FREESE & NICHOLS, INC. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL I I I I I I I I I I " 1-1 Mobilization 1 LS $ 500,000.00 $ 500,000.00 1-2 Preoarina Riaht-of-Way 15.50 AC $ 5,000.00 $ 77,500,00 1-3 Unclassified Excavation (Roadway) iTxDOT, 1993 Item 110) 73.467 CY $ 8.00 $ 587,736,00 1-4 Stockpile and Spread 4-lnch Depth Topsoil 27,500 SY $ 1.15 $ 31,625.00 1-5 Bermudaarass Sod 27,500 SY $ 2.50 $ 68,750.00 1-6 Prepare and Implement Storm Water Pollution Prevention Plan 1 LS $ 40,000.00 $ 40,000.00 IIA-1 6" Lime Stabilized Subgrade 32,000 SY $ 2.25 $ 72,000.00 IIA-2 Lime for Stabilization (6% by Weight) 400 TON $ 100.00 $ 40,000.00 IIA-3 8" Concrete Pavement Class "C" 27,505 SY $ 55.00 $ 1,512,775.00 IIA-5 4" Concrete Sidewalk 5 It Wide 34,000 SF $ 3.50 $ 119,000.00 IIA-6 Sidewalk Ramo (Type A) 8EA $ 700.00 $ 5,600.00 118-1 6" Lime Stabilized Subgrade 17,800 SY $ 2.25 $ 40,050.00 118-2 Lime for Stabilization (6% by Weight) 223 TON $ 100.00 $ 22,250.00 IIB-3 8" Concrete Pavement Class "CO 16,000 SY $ 55.00 $ 880,000.00 118-4 7" Doweled Concrete Curb and Gutter (2.5' wide) 1,350 LF $ 7.00 $ 9,450.00 IIB-5 4" Concrete Sidewalk 5 It Wide 35,500 SF $ 3.50 $ 124,250.00 IIB-6 Sidewalk Ramo (Tvpe A) 10 EA $ 700.00 $ 7,000.00 111-1 Draina e 1 LS $ 940,000. $ 940 000.00 IV-1 12" PVC AWWA C-900 DR 18 and 01 FittinasTOpen Cut) Sewer 10 It depth 6,900 LF $ 85.00 $ 586,500.00 IV-2 4 Foot Manhole 15 EA $ 3,000.00 $ 45,000.00 IV-3 12" PVC AWWA C-900 DR 18 and 01 Filtinas (Open Cut) Water 5 It depth 6,000 LF $ 85.00 $ 510,000.00 IV-4 12" Gate Valves 8EA $ 1,500.00 $ 12,000.00 IV-5 Mueller Fire Hydrant Assembiy 14 EA $ 2,500.00 $ 35,000.00 IV-6 Labor, Materials, Equipment for Connection to Exist. And Prop. WL 4EA $ 2,000.00 $ 8,000.00 IV-7 Irrioation Medians 247,500 SF $ 1.00 $ 247,500:00 V-l Demo Old Bridoe 1 EA $ 25,000.00 $ 25,000.00 VI-1 Permanent Pavem~nt Markinos & Sign age . . 1 LS 28,000.00 $ 28,000.00 $ 1,405,611.00 $ 1,752,675.00 $ 1,086,300.00 $ 940,000.00 $ 1,456,900.00 $ 565,000.00 $ 28,000.00 $ 7,234,486.00 30% Contingency $ 2,170,345.80 TOTAL = $ 9,404,831 "80