ST0502B-CS060808
~ \" '0 'S o-z.... e,
TRANSPORTATION IMPROVEMENT PROGRAM
DALLAS DISTRICT
DALLAS-FORT WORTH MPO
FY 2008
PAGE: 37
STIP REPORT
-
DISTRICT
DALLAS
LIMITS FROM:
DESCRIPTION2 :
DESCRI PTION2:
DESCRIPTION3:
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRIPTION2:
DESCRIPTION2:
DESCRIPTION3:
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRIPTION2:
DESCRIPTION2:
DESCRIPTION3:
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRI PTION2:
DESCRIPTION2:
DESCRI PT ION3 :
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRI PTION2:
DESCRI PTION2:
DESCRIPTION3:
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRI PTION2:
DESCRI PTION2:
DESCRI PT ION3 :
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRIPTION2:
DESCRIPTION2:
DESCRIPTION3:
LAYMAN DESC:
REMARKS:
NEPA STATUS:
DALLAS
LIMITS FROM:
DESCRIPTION2:
DESCRIPTION2:
DESCRI PTION3:
LAYMAN DESC:
REMARKS:
NEPA STATUS:
COUNTY CONT-SECT-JOB IIWY
DALLAS 0918-45-372 CS
ON HATCHER ST FROM SPRING AVE
WIDEN 4 LANE TO 5 LANE AND INTERSECTION IMPROVEMENT WITH
CONTINUOUS LEFT TURN LANE
LET DATE
12/2007
PHASE CITY MPO PROJ ID
C,E,R DALLA S 0633
LIMITS TO: HASKELL AVE./ MILITARY
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
EST COST
$2,300,000
PARKWAY
MTP REFERENCE: TH2600 (NRA)
0918-45-374 MH 07/2008
VALLEY VIEW/WALNUT FROM
4 LANES TO 6 LANES
C, E, R DALLA S 0684 $10,820,000
LIMITS TO: IH 635/GREENVILLE TO FOREST RIDGE
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
PHASE: C~CONSTRUCTION, E ~ ENGINEERING, R ~ ROW, T ~ TRANSFER
ADD 1 LANE
TH2001
PENDING
DALLAS
IN DALLAS,
WIDEN FROM
LOCAL CONT: $0
STATEWIDE CSJ:
CONTINUOUS LEFT TURN LANE TO EXISTING 4 LANE
WIDEN FROM LANES TO 6 LANES
TH2001
PENDING MTP REFERENCE: TH2600 (NRA)
DALLAS 0918-45-707 VA 03/2008 C, E
ON BELT LINE RD FROM SH 289/PRESTON
WIDEN EXISTING 6 LANE DIVIDED ROADWAY TO 8 LANE DIVIDED, EB
TO PRESTON RD., WB FROM PRESTON +/- 200' EAST OF PRESTONWOOD
LOCAL CONT: $ 0
STATEWIDE CSJ:
$2,737,235
C,E,R COPPEL L 11532 $4,550,000
LIMITS TO: SANDY LAKE RD IN CITY OF COPPELL
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
C, E, R COPPEL L 11533 $4,210,000
LIMITS TO: RUBY RD IN CITY OF COPPELL
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
$3,000,000
PRAIRIE
$9,712,600
$6,000,000
DALLA S 11012
LIMITS TO: DALLAS PARKWAY
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
WIDEN EXISTING 6 LANE DIVIDED ROADWAY TO 8 LANE DIVIDED, EB
LOCAL CONT: $ 0
STATEWIDE CSJ:
PENDING MTP REFERENCE:
DALLAS 0918-47-983 CS
FREEPORT PKWY FROM SH 121
CONSTRUCT 6-LANE FACILITY
THl 8.1
08/2008
Note 1: Emission reduction estimates for Intelligent Transportation Systems (ITS) are quantified as a system. In 2007, 75%
(350 miles) of the freeway system in Dallas and Tarrant Counties will be covered by the ITS Program, which amounts to daily
emission reduction benefits of 4,101 pounds/day of VOC and 14,484 pounds/day of NOx.
CONSTRUCT 6-LANE FACILITY
LOCAL CONT: $0
STATEWIDE CSJ:
MTP REFERENCE:
DALLAS 0918-47-984 CS
FREEPORT PKWY FROM SANDY LAKE RD
WIDEN 2 TO 4 LANES
08/2008
WIDEN 2 TO 4 LANES
LOCAL CONT: $0
STATEWIDE CSJ:
MTP REFERENCE:
DALLAS 0918-48-900 CS
GIFFORD ST FROM MACARTHUR
EXTEND FOUR LANE CITY STREET
06/2008
C,E,R OTHER 11528
LIMITS TO: BAGDAD IN CITY OF GRAND
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
EXTEND FOUR LANE CITY STREET
LOCAL CONT: $ 0
STATEWIDE CSJ:
XX
ROCKWALL
FM 3097
WIDEN 2 LN
MTP REFERENCE: TH2600 (NRA)
1014-03-039 FM 740 03/2008
C,R
ROCKWAL L 2984,2987
LIMITS TO: FM 1140
FUND CATEGORY: 7 METRO MOBILITY
RURAL TO 4 LN DIV URBAN
REV DATE:
09/2005
WIDEN 2 LN RURAL TO 4 LN DIV URBAN
TH2005
PENDING
ROCKWALL
FM 1140
WIDEN 2 LANE TO 4 LANE DIVIDED URBAN
LOCAL CONT: $ 0
STATEWIDE CSJ:
MTP REFERENCE: CANCELLED
1014-03-908 FM 740 06/2008
E
HEAT H
LIMITS TO: FM 549
FUND CATEGORY: 7 METRO MOBILITY
REV DATE: 09/2005
WIDEN 2 LANE TO 4 LANE DIVIDED URBAN
LOCAL CONT: $2,000,000
STATEWIDE CSJ:
xx
MTP RE FERENCE:
7TOS02~
d~ 40n\'.~#
2008 - 2011 TIP DEVELOPMENT WORKSHEETS
COPPELL
PROJECT CCIlIT ---111'111" ,> ,,'
Projec:t CSJ City Project Description Proje<:tType TIP Feder. Lot ComP'etion Total Local State Federal Constr/Obl 2006 2007 2008 2009 2010 2015
Code V..r Catogoly Date Data
11533 091847984 COPPELL FREEPORT Ptt:WY FROM SANOY LAKE RD TO RUBY RO ADDITION OF LANES 2008 STP-MM 200808 4.210,000 842,000 0 3.368.000 0 0 0 3.368,000 0 0 0
Project WIDEN 2 TO 4 LANES NCTCOG
Description Comments
Agency
Comments
11532 091847983 COPPELL FREEPORT PKWY FROM SH 121 TO SANDY LAKE RO NEW ROADWAY 2008 STP-MM 200808 4,550,000 910,000 0 3,640,000 0 0 0 3,640,000 0 0 0
Project CONSTRUCT 6-lANE FACILITY NCTCOG
Description Comments
Agency
Comments
mA2r /J~ 01
-----
..
Prtnted 8/812006
Page 1 of 1
Sorted by: Project Type, City, Project Code