Loading...
ST0502B-CS060808 ~ \" '0 'S o-z.... e, TRANSPORTATION IMPROVEMENT PROGRAM DALLAS DISTRICT DALLAS-FORT WORTH MPO FY 2008 PAGE: 37 STIP REPORT - DISTRICT DALLAS LIMITS FROM: DESCRIPTION2 : DESCRI PTION2: DESCRIPTION3: LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRIPTION2: DESCRIPTION2: DESCRIPTION3: LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRIPTION2: DESCRIPTION2: DESCRIPTION3: LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRI PTION2: DESCRIPTION2: DESCRI PT ION3 : LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRI PTION2: DESCRI PTION2: DESCRIPTION3: LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRI PTION2: DESCRI PTION2: DESCRI PT ION3 : LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRIPTION2: DESCRIPTION2: DESCRIPTION3: LAYMAN DESC: REMARKS: NEPA STATUS: DALLAS LIMITS FROM: DESCRIPTION2: DESCRIPTION2: DESCRI PTION3: LAYMAN DESC: REMARKS: NEPA STATUS: COUNTY CONT-SECT-JOB IIWY DALLAS 0918-45-372 CS ON HATCHER ST FROM SPRING AVE WIDEN 4 LANE TO 5 LANE AND INTERSECTION IMPROVEMENT WITH CONTINUOUS LEFT TURN LANE LET DATE 12/2007 PHASE CITY MPO PROJ ID C,E,R DALLA S 0633 LIMITS TO: HASKELL AVE./ MILITARY FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 EST COST $2,300,000 PARKWAY MTP REFERENCE: TH2600 (NRA) 0918-45-374 MH 07/2008 VALLEY VIEW/WALNUT FROM 4 LANES TO 6 LANES C, E, R DALLA S 0684 $10,820,000 LIMITS TO: IH 635/GREENVILLE TO FOREST RIDGE FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 PHASE: C~CONSTRUCTION, E ~ ENGINEERING, R ~ ROW, T ~ TRANSFER ADD 1 LANE TH2001 PENDING DALLAS IN DALLAS, WIDEN FROM LOCAL CONT: $0 STATEWIDE CSJ: CONTINUOUS LEFT TURN LANE TO EXISTING 4 LANE WIDEN FROM LANES TO 6 LANES TH2001 PENDING MTP REFERENCE: TH2600 (NRA) DALLAS 0918-45-707 VA 03/2008 C, E ON BELT LINE RD FROM SH 289/PRESTON WIDEN EXISTING 6 LANE DIVIDED ROADWAY TO 8 LANE DIVIDED, EB TO PRESTON RD., WB FROM PRESTON +/- 200' EAST OF PRESTONWOOD LOCAL CONT: $ 0 STATEWIDE CSJ: $2,737,235 C,E,R COPPEL L 11532 $4,550,000 LIMITS TO: SANDY LAKE RD IN CITY OF COPPELL FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 C, E, R COPPEL L 11533 $4,210,000 LIMITS TO: RUBY RD IN CITY OF COPPELL FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 $3,000,000 PRAIRIE $9,712,600 $6,000,000 DALLA S 11012 LIMITS TO: DALLAS PARKWAY FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 WIDEN EXISTING 6 LANE DIVIDED ROADWAY TO 8 LANE DIVIDED, EB LOCAL CONT: $ 0 STATEWIDE CSJ: PENDING MTP REFERENCE: DALLAS 0918-47-983 CS FREEPORT PKWY FROM SH 121 CONSTRUCT 6-LANE FACILITY THl 8.1 08/2008 Note 1: Emission reduction estimates for Intelligent Transportation Systems (ITS) are quantified as a system. In 2007, 75% (350 miles) of the freeway system in Dallas and Tarrant Counties will be covered by the ITS Program, which amounts to daily emission reduction benefits of 4,101 pounds/day of VOC and 14,484 pounds/day of NOx. CONSTRUCT 6-LANE FACILITY LOCAL CONT: $0 STATEWIDE CSJ: MTP REFERENCE: DALLAS 0918-47-984 CS FREEPORT PKWY FROM SANDY LAKE RD WIDEN 2 TO 4 LANES 08/2008 WIDEN 2 TO 4 LANES LOCAL CONT: $0 STATEWIDE CSJ: MTP REFERENCE: DALLAS 0918-48-900 CS GIFFORD ST FROM MACARTHUR EXTEND FOUR LANE CITY STREET 06/2008 C,E,R OTHER 11528 LIMITS TO: BAGDAD IN CITY OF GRAND FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 EXTEND FOUR LANE CITY STREET LOCAL CONT: $ 0 STATEWIDE CSJ: XX ROCKWALL FM 3097 WIDEN 2 LN MTP REFERENCE: TH2600 (NRA) 1014-03-039 FM 740 03/2008 C,R ROCKWAL L 2984,2987 LIMITS TO: FM 1140 FUND CATEGORY: 7 METRO MOBILITY RURAL TO 4 LN DIV URBAN REV DATE: 09/2005 WIDEN 2 LN RURAL TO 4 LN DIV URBAN TH2005 PENDING ROCKWALL FM 1140 WIDEN 2 LANE TO 4 LANE DIVIDED URBAN LOCAL CONT: $ 0 STATEWIDE CSJ: MTP REFERENCE: CANCELLED 1014-03-908 FM 740 06/2008 E HEAT H LIMITS TO: FM 549 FUND CATEGORY: 7 METRO MOBILITY REV DATE: 09/2005 WIDEN 2 LANE TO 4 LANE DIVIDED URBAN LOCAL CONT: $2,000,000 STATEWIDE CSJ: xx MTP RE FERENCE: 7TOS02~ d~ 40n\'.~# 2008 - 2011 TIP DEVELOPMENT WORKSHEETS COPPELL PROJECT CCIlIT ---111'111" ,> ,,' Projec:t CSJ City Project Description Proje<:tType TIP Feder. Lot ComP'etion Total Local State Federal Constr/Obl 2006 2007 2008 2009 2010 2015 Code V..r Catogoly Date Data 11533 091847984 COPPELL FREEPORT Ptt:WY FROM SANOY LAKE RD TO RUBY RO ADDITION OF LANES 2008 STP-MM 200808 4.210,000 842,000 0 3.368.000 0 0 0 3.368,000 0 0 0 Project WIDEN 2 TO 4 LANES NCTCOG Description Comments Agency Comments 11532 091847983 COPPELL FREEPORT PKWY FROM SH 121 TO SANDY LAKE RO NEW ROADWAY 2008 STP-MM 200808 4,550,000 910,000 0 3,640,000 0 0 0 3,640,000 0 0 0 Project CONSTRUCT 6-lANE FACILITY NCTCOG Description Comments Agency Comments mA2r /J~ 01 ----- .. Prtnted 8/812006 Page 1 of 1 Sorted by: Project Type, City, Project Code