Loading...
Hard 8 BBQ-CS0510241 o 2.4 S e M 0 1,v -srt cz k ge W a a a� DEVELOPMENT FEE TABLE 1 I /41 5 wa�.z c-e.5 pe A evi 2 ea.. Ay,"_2fl CA ime7v, ,covv\ Project: Crescent Addition Lot Blk 1 (Hard Eight) Date: 7/26/2005 TOTAL FEES DUE AMOUNT DUE PRIOR TO FILING PLAT Water Impact Fee (100% due at Issuance of Building Permit) $5,180.00 Water Tap Inspection Fee (100% due at Issuance of Water Meter) $200.00 Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) $204.34 Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) $9,286.84 Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) $30.00 Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) $90.00 Wastewater Impact Fee (100% due at Issuance of Building Permit) $2,240.00 Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) $50.00 Utility Final Inspection Fee (100% due at Issuance of Building Permit) $50.00 Park Fee (100% due prior to Filing Plat) $0.00 $0.00 Roadway Impact Fee (100% due prior to Filing Plat) $14,915.25 $14,915.25 Street Light Fee (100% due prior to Acceptance of Project) Information not Available 11 Street Sign Fee (100% due prior to Acceptance of Project) Information not Available 11 Construction Inspection Fee (100% due prior to Start of Construction) Information not Available TOTAL $32,246.43 $14,915.25 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT 1 o 2.4 S e M 0 1,v -srt cz k ge W a a a� DEVELOPMENT FEE TABLE 1 I /41 5 wa�.z c-e.5 pe A evi 2 ea.. Ay,"_2fl CA ime7v, ,covv\ Project: Crescent Addition Lot Blk 1 (Hard Eight) Date: 7/26/2005