Hard 8 BBQ-CS0510241 o 2.4 S e M 0 1,v -srt cz k ge W a a a�
DEVELOPMENT FEE TABLE 1 I /41 5
wa�.z c-e.5 pe
A evi 2 ea..
Ay,"_2fl CA ime7v, ,covv\
Project: Crescent Addition Lot Blk 1 (Hard Eight)
Date: 7/26/2005
TOTAL
FEES DUE
AMOUNT DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
(100% due at Issuance of Building Permit)
$5,180.00
Water Tap Inspection Fee
(100% due at Issuance of Water Meter)
$200.00
Water Meter Fee (Domestic)
(100% due at Issuance of Water Meter)
$204.34
Water Meter Fee (Irrigation/Fireline)
(100% due at Issuance of Water Meter)
$9,286.84
Water Meter Deposit (Domestic)
(100% due at Issuance of Water Meter)
$30.00
Irrigation/Fireline Meter Deposit
(100% due at Issuance of Water Meter)
$90.00
Wastewater Impact Fee
(100% due at Issuance of Building Permit)
$2,240.00
Wastewater Tap Inspection Fee
(100% due at Issuance of Building Permit)
$50.00
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
$50.00
Park Fee
(100% due prior to Filing Plat)
$0.00
$0.00
Roadway Impact Fee
(100% due prior to Filing Plat)
$14,915.25
$14,915.25
Street Light Fee
(100% due prior to Acceptance of Project)
Information not Available
11
Street Sign Fee
(100% due prior to Acceptance of Project)
Information not Available
11
Construction Inspection Fee
(100% due prior to Start of Construction)
Information not Available
TOTAL
$32,246.43
$14,915.25
I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
1 o 2.4 S e M 0 1,v -srt cz k ge W a a a�
DEVELOPMENT FEE TABLE 1 I /41 5
wa�.z c-e.5 pe
A evi 2 ea..
Ay,"_2fl CA ime7v, ,covv\
Project: Crescent Addition Lot Blk 1 (Hard Eight)
Date: 7/26/2005