Vista Properties-LR 960919A ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620 -8911
TESTED FOR:
PROJECT:
TEST DATA
REPORT OF FIELD
COMPACTION TESTS
CENTEX HOMES (F /K /A VISTA PARTNEt 09/19/96
DALLAS, TEXAS
SANITARY SEWER & WATER OURREPORTNO. 96562 - 21
IMP. - VISTA RIDGE, AREA F
COPPELL, TEXAS
TEST
NO.
DATE
ELEV.
DEPTH
SOIL ID
NUMBER
OPTIMUM
MOISTURE
MAXIMUM LAB
DRY DENSITY
IN PLACE
MOIST
IN PLACE
DRY DENSITY
PERCENT
COMPACTION
COMMENT'
179
09/19
FG -6.0
1
20.5
99.5
20.7
96
97
1 -A
180
09/19
FG -5.0
1
20.5
99.5
20.9
96
96
1 -A
181
09/19
FG -4.0
1
20.5
99.5
21.2
96
97
1 -A
182
09/19
FG -3.0
1
20.5
99.5
21.9
95
96
1 -A
183
09/19
FG -2.0
1
20.5
99.5
21.0
97
97
1 -A
184
09/19
FG -1.0
1
20.5
99.5
20.8
97
97
1 -A
185
09/19
FG
1
20.5
99.5
21.4
96
96
1 -A
TFCT 1 (111kTInN-
179
SANITARY
SEWER
LINE
"D"
AT
STATION
47 +00
180
SANITARY
SEWER
LINE
"D"
AT
STATION
#7 +75
81
SANITARY
SEWER
LINE
"D"
AT
STATION
#7 +50
$2
SANITARY
SEWER
LINE
"D"
AT
STATION
#7 +25
83
SANITARY
SEWER
LINE
"D"
AT
STATION
#8 +75
84
SANITARY
SEWER
LINE
"D"
AT
STATION
#6 +75
85
SANITARY
SEWER
LINE
" D "
AT
STATION
#7 +35
1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS R ectfully Submitted,
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALPHA TESTING
4. CEMENT TREATED D. RETEST 4a P S t ner
CGO1083 -18
A ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620 -8911
TESTED FOR
PROJECT:
TEST DATA
REPORT OF FIELD
COMPACTION TESTS
CENTEX HOMES (F /K /A VISTA PARTNERS 09/19/96
DALLAS, TEXAS DA E:
SANITARY SEWER & WATER OUR REPORT NO. 96562 -21A
IMP. - VISTA RIDGE, AREA F
COPPELL, TEXAS
TEST
N0.
DATE
ELEV.
DEPTH
SOIL ID
NUMBER
OPTIMUM
MOISTURE
%
MAXIMUM LAB
DRY DENSITY
PCF
IN PLACE
MOISTURE
%
IN PLACE
DRY DENSITY
PCF
PERCENT
COMPACTION
COMMENT'
186
09/19
FG -6.0
1
20.5
99.5
20.9
96
96
1 -A
187
09/19
FG -5.0
1
20.5
99.5
21.2
95
96
1 -A
188
09/19
FG -4.0
1
20.5
99.5
20.8
97
97
1 -A
189
09/19
FG -3.0
1
20.5
99.5
21.6
96
97
1 -A
190
09/19
FG -2.0
1
20.5
99.5
21.0
97
97
1 -A
191
09/19
FG -1.0
1
20.5
99.5
21.7
95
96
1 -A
192
09/19
FG
1
20.5
99.5
21.3
96
96
1 -A
TEST LOCATION:
186
SANITARY
SEWER
LINE
"D"
AT
STATION
#10 +25
187
SANITARY
SEWER
LINE
"D"
AT
STATION
#10 +00
188
SANITARY
SEWER
LINE
"D"
AT
STATION
#
9 +75
189
SANITARY
SEWER
LINE
"D"
AT
STATION
#
9 +50
190
SANITARY
SEWER
LINE
"D"
AT
STATION
#
9 +25.
191
SANITARY
SEWER
LINE
"D"
AT
STATION
#
9 +00
192
SANITARY
SEWER
LINE
"D"
AT
STATION
#
9 +45
1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS R tfuiiy Submitted,
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS A HA TESTING
4. CEMENT TREATED D. RETEST P S n
CGO1083 -18