Loading...
Vista Properties-LR 960916A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620 -8911 REPORT OF FIELD COMPACTION TESTS CENTEX HOMES (F /K /A VISTA PARTNERS 09/16/96 TESTED FOR: DALLAS, TEXAS DA E: PROJECT: SANITARY SEWER & WATER OUR REPORT NO. 96562 -20 IMP. - VISTA RIDGE, AREA F COPPELL, TEXAS TEST DATA: TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT' 166 09/16 FG -1.2 1 20.5 99.5 21.6 97 97 1 -A 167 09/16 FG -1.1 1 20.5 99.5 20.9 98 98 1 -A 168 09/16 FG -1.0 1 20.5 99.5 21.3 97 98 1 -A 169 09/16 FG -9.0 1 20.5 99.5 21.0 98 99 1 -A 170 09/16 FG -8.0 1 20.5 99.5 20.9 98 98 1 -A 171 09/16 FG -7.0 1 20.5 99.5 21.5 98 98 1 -A 172 09/16 FG--6.0 1 1 20.5 99.5 21.7 97 97 1 -A TEST LOCATION: 166 10" SANITARY SEWER LINE "D" AT STATION #6 +00 167 10" SANITARY SEWER LINE "D" AT STATION #5 +75 168 10" SANITARY SEWER LINE "D" AT STATION #5 +50 169 10" SANITARY SEWER LINE "D" AT STATION #5 +25 170 10" SANITARY SEWER LINE "D" AT STATION #4 +75 171 10" SANITARY SEWER LINE "D" AT STATION #4 +50 172 10" SANITARY SEWER LINE "D" AT STATION #4 +25 1. FILL . A. TEST RESULTS COMPLY WITH SPECIFICATIONS espectfully Subm' ed, 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS � LPHA T { C. 4. CEMENT TREATED D. RETEST J St . ttn @r CGot083 -18 �� A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620 -8911 TESTED FOR PROJECT: REPORT OF FIELD COMPACTION TESTS CENTEX HOMES (F /K /A VISTA PARTNERS) 09/16/96 DALLAS, TEXAS DATE: SANITARY SEWER & WATER OURREPORTNO. 96562 - 20A IMP. - VISTA RIDGE, AREA F COPPELL, TEXAS TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT' 173 09/16 FG -5.0 1 20.5 99.5 21.1 97 97 1 -A FG -4.0 1 20.5 99.5 20.6 98 98 1 -A 174 09/16 FG -3.0 1 20.5 99.5 20.8 98 98 1 -A 175 09/16 176 09/16 FG -2.0 1 20.5 99.5 21.0 97 97 1 -A 1 20.5 99.5 20.6 98 99 1 -A 177 09/16 FG -1.0 1 20.5 99.5 20.9 97 98 1 -A 178 09116 FG TEST LOCATION: 173 10" 10" 10" 10" 10" SANITARY SANITARY SANITARY SANITARY SANITARY SEWER SEWER SEWER SEWER SEWER LINE LINE LINE LINE LINE "D" "D" "D" "D" "D" AT AT AT AT AT STATION STATION STATION STATION STATION #4 +00 #5 +00 #5 +85 #5 +35 #4 +85 174 175 176 177 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED ' A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST spectfully Subm' ed, ALPHA TE ` Davicl� at St ttner CG01083 -1 B