Loading...
DR8902-CS 890622June 22, 1989 MEMORANDUM TO: Alan Ratliff, City Manager FROM: Russell R. Doyle, P.E., City Engineer RE: BETHEL SCHOOL ROAD AND PELICAN LOCAL DRAINAGE IMPROVEMENTS - BIDS FOR CONSTRUCTION Per the attached special report, previously furnished, Ginn, Inc. took bids at 2:00 p.m. on Wednesday, June 21, 1989, and has provided the attached bid summary on t~ one bid received. The base bid received for a total of $64,000 for both sites, is the originally designed improvements as recommended by the design en§ineer, Ginn, Inc., and agreed upon during the meeting with the residents1 representativ~at Town Center on March 20, 1989. The alternates as attached, are the options requested at the meeting of June 8, 1989, by the residents. These alternatives would provide a higher level of flood protection. Staff recommends aw,~-~in~ at least the base bid of $~000. RRD/lsg xc: PELBIDS