Vista Properties-LR 960824A /// ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620 -8911
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR: CENTEX HOMES D ATE : 8/24/96
(F /K/A VISTA PARTNERS)
DALLAS, TEXAS
PROJECT: SANITARY SEWER & WATER OUR REPORT NO. 96562 -13
IMPROVEMENTS
COPPELL, TEXAS
TEST DATA
TEST
NO.
DATE
ELEV.
DEPTH
SOIL ID
NUMBER
OPTIMUM
MOISTURE
%
MAXIMUM LAB
DRY DENSITY
PCF
IN PLACE
MOISTURE
%
IN PLACE
DRY DENSITY
PCF
PERCENT
COMPACTION
COMMENT`
120
08/24/96
FG - 6.0
3
16.6
106.6
17.1
104
97
1 -A
121
08/24/96
FG - 5.0
3
16.6
106.6
16.9
103
97
1 -A
122
08/24/96
FG - 4.0
3
16.6
106.6
17.9
103
96
1 -A
123
08/24/96
FG - 3.0
3
16.6
106.6
17.0
104
97
1 -A
124
08/24/96
FG - 2.0
3
16.6
106.6
17.5
104
98
1 -A
125
08/24/96
FG - 1.0
3
16.6
106.6
16.8
104
98
1 -A
126
08/24/96
FG
3
16.6
106.6
16.9
104
98
1 -A
TEST LOCATION:
120
18" SANITARY SEWER LINE "A" STA:
10+50
121
18" SANITARY SEWER LINE "A" STA:
10+00
122
18" SANITARY SEWER LINE "A" STA:
9+75
123
18" SANITARY SEWER LINE "A" STA:
9+25
124
18" SANITARY SEWER LINE "A" STA:
9+00
125
18" SANITARY SEWER LINE "A" STA:
8+75
126
18" SANITARY SEWER LINE "A" STA:
8+50
1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS Res p ully Submitted,
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS VID (PAT) STET
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS A HA TESTING, INC
4. CEMENT TREATED D. RETEST
CODIO83 -18